Tram Works Officially Started in Erzurum

tramway work started officially
tramway work started officially

The drilling test for the tramway test was published in the Official Gazette and the XErzurum Light Rail System (Tramway) Project, a project worth £ 1 million, started.

ErzurumgünebakışAccording to the news of "Sinan AYDIN"; The Light Rail System (Tram) project, which has been on the agenda of Erzurum since 2015, has finally become official and finalized. According to the decision published in the Official Gazette; The construction of two tram lines in Erzincan and Erzurum will be done by the Ministry of Transport, Maritime Affairs and Communications. In this context, sounding was started for the Tram floor test in Erzurum. According to the decision of the Council of Ministers on the subject, the construction of the tram lines of Gar-Atatürk University Campus-Medical Faculty-Regional Training and Research Hospital-City Hospital-Yavuz Sultan Selim Boulevard-Gar, which belongs to the Erzurum Metropolitan Municipality, will be carried out by the Ministry of Transport, Maritime Affairs and Communications. The tram project is one of Erzurum's vision projects. Erzurum Metropolitan Municipality Mayor Mehmet Sekmen, who made important statements on a pictogram he attended before the local elections, said, “Our 20-kilometer light rail system project is complete. Mr. President also approved. We are starting to work soon. ”

THE DETAILS OF THE TRAVEL LINE WAS THE BEST! 890 MILLION A PROJECT

All the details of the Erzurum Tram Line, which will contribute to the development of the region by relaxing urban transportation, were also announced. The 890 million TL tramway project will be carried out by the Ministry of Transport and Infrastructure. 2 5 15.477,20 5.696,55 XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX Erzurum tram line, which will provide transportation for two districts, will be located within the borders of Yakutiye and Palandöken districts.

WORKING STATIONS

The platform width of the project route will be 6,80 m and the platform width will be designed as 11,80 m. The line is calculated to reach 10.026 passengers / hour in one direction with the highest value in peak hour.

Stations of the first stage:

Gar, Lala Pasha, Municipality, University-1, University-2, Dormitories, Hospital, Toki, Yavuz Selim-1, Yavuz Selim-2, Forum, Yunus Emre, Ataturk Boulevard, Green Yakutiye,

Stations of the second stage:

Sağlam Evler, 3 July, Bus Station, Fair, Stadium, Faculty of Engineering,

Be the first to comment

Leave a response

Your email address will not be published.


*