New Underpass for Kuruçeşme Tram Line

new sub night for kurucesme tram line
new sub night for kurucesme tram line

Kocaeli Metropolitan Municipality continues to provide services that will bring breathability and comfort to transportation throughout the city. The subway will be constructed by the Kocaeli Metropolitan Municipality in the section that will be extended to the Kuruçeşme zone, which won the satisfaction of the citizens. Izmit D - 100 highway will be built on the subway under the Mevlana Junction, passing through the tramway vehicles will be transition to the beach.

18 METERS LONG
Within the scope of the works to be carried out at Mevlana Junction, the existing old sub-gate will be demolished and a new subway with 18 meter length and 6 meter height will be constructed. 9 meter cubic ready concrete, 895 ton ribbed reinforcement steel, thousand square meter parquet, 90 bin 2 meter border, 500 bin 6 tone asphalt and 100 meter auto railing will be manufactured in the new subway.

ARRANGEMENTS TO BE MADE IN MEVLANA JUNCTION
The subway to be constructed within the scope of the tram line to be reached from the school district via the D - 100 Highway and to Kuruçeşme from the Kocaeli Gümüşhaneliler Foundation will be provided. Within the scope of underpass works, various arrangements will be made in the branches of D - 100, side road and Mevlana junction.

new sub night for kurucesme tram line
new sub night for kurucesme tram line

Be the first to comment

Leave a response

Your email address will not be published.


*