Gebze Halkalı Signalization Tests in Train Line Started

Gebze Halkalı Signalization Tests in Train Line Started
Gebze Halkalı Signalization Tests in Train Line Started

Transport and Infrastructure Minister Cahit Turhan, Gebze-Halkalı He said that the European Train Control System and Automatic Train Protection will be used in the signaling of the Marmaray line.

Turhan, who answered the written proposal of Islam to the Parliament by Saadet Party Istanbul Deputy Nazır Cihangir Islam, said: “Gebze-Halkalı Submarines will be operated on Line 1 and Line 2 on the Marmaray line, Communication Based Train Control (CBTC) and Automatic Train Protection (ATP) for suburban trains on Line1 and Line2, and high-speed train, main line and freight trains on Line3. The signaling system will be the European Train Control System (ETCS) and ATP. These systems are proven to be reliable in Europe, and are built by Siemens, a CR3 contractor, part of the OHL-Siemens consortium. When the signaling system tests are completed, the entire system will be commissioned after being certified by the internationally competent TUV-SUD for security. ”

Currently Gebze-Halkalı Noting that the infrastructure works on the Marmaray line have been completed and the signaling system tests are continuing, Turhan said, "After these tests are completed, a test drive will be made and the safety certificate will be obtained from TUV-SUD before it is put into commercial operation, and it will be put into commercial operation with proven signal systems as stated above." . – BARIŞ ŞİMŞEK – Morning

Be the first to comment

Leave a response

Your email address will not be published.


*