Kadıköy Tavşantepe Metro Stations Route Duration

kadikoy tavsantepe metro stops
kadikoy tavsantepe metro stops

Kadıköy Tavşantepe Metro Stations Route Duration: Line 1. stage was completed in 2012 and opened to service with 21,7 station in 16 km section between Kadıköy and Kartal. With the construction of Yakacık-Adnan Kahveci, Pendik and Tavşantepe stations, 2. stage has been completed. 2. The length of the line increased to 26,5 km and the number of stations increased to 19. The average run time of the line is 82 minutes. The subway, which starts its journey at 06.00 in the morning, continues to operate until 24.00. Every 4 saves passengers time by having one trip per minute.

The line is located on the D100 route starting from Kadikoy and in Acıbadem region and follows this route until Tavşantepe. There is a warehouse with 52 vehicle (13 train) capacity and a maintenance workshop with total 32 vehicle capacity between Maltepe and Huzurevi stations on the line and in Maltepe Station area. The entire line, including warehouse and workshop areas, was built underground.

STATION STRUCTURES

The tunnels of the line are between TBM - Kozyatağı and Kartal - Kaynarca; It was excavated by NATM method between Kozyatağı and Kartal. There is an additional rail track and two side platforms at Bostancı Station, considering the need for alternative operation. All other stations are constructed as a side platform. Station length is 180 meters and suitable for train operation with 8. There are 259 pieces of escalators and 70 units. The 30 turn-by-turn is designed to allow 315 to pass through for passengers with disabilities.

SYSTEM SAFETY AND SAFETY

Smoke and passenger evacuation scenarios have been prepared against the negative situations that may occur in Kadıköy Tavşantepe Metro Line and simulations related to these scenarios have been tested. With the total 991 cameras in the stations, the system is continuously monitored, controlled and inspected by security guards.

The signaling of the line and the storage area has a continuous communication-based Motion Block system. The signaling system is Thales CBTC system and there is no driver parking for trains.

All equipment used in the construction of the line is selected from materials that are resistant to high temperature and do not emit toxic gases. In the event of fire, to ensure the evacuation of the passengers as soon as possible and safely; There is a reliable smoke control and evacuation system in accordance with the standards, especially NFPA, which can operate fully automatically.

At the Kadıköy Tavşantepe Metro Line, the energy supply of the whole system is carried out from 3 separate points. If all three supply points fail, the generators at the 2 separate terminal are activated. With the activation of the generators, all trains in the tunnel are delivered to the nearest station and the passengers are evacuated. In case of failure of supply of energy and failure of generators; The lighting system and electronic control systems can be powered by uninterruptible power supplies for 3 hours.

INTEGRATION

  • Kadikoy Station, T3 Kadıköy - Moda Tram Line, city lines, sea buses and marine engines,
  • At Ayrılık Fountain Station, Marmaray,
  • At Ünalan Station,
  • In Pendik Station, transfer can be made to Pendik High Speed ​​Train Station via IETT buses.

KADIKÖY-TAVŞANTEPE METRO STOPS

  1. Kadikoy
  2. Ayrilik Cesmesi
  3. Bitter almond
  4. Ünalan
  5. Göztepe
  6. Yenisahra
  7. Kozyatağı
  8. Bostanci
  9. Küçükyalı
  10. Maltepe
  11. nursing home
  12. Rose water
  13. Esenkent
  14. Hospital-Justice
  15. Soganlik
  16. Kartal
  17. View Yakacik's Full Profile
  18. Pendik
  19. Tavşantepe

Map of Istanbul Metro