Transfer to Istanbul Airport is Postponed to 5 April

date of departure to Istanbul airport 5 postponed to April
date of departure to Istanbul airport 5 postponed to April

The change in the transfer schedule at Istanbul Airport was officially announced. The 5 April 2019 will start at 03: 00, and the 7 April 2019 will end at 00: 00. Atatürk Airport, 7 April and 00.00 will be closed for scheduled and non-scheduled domestic and international transport

The conditions of use of Istanbul Atatürk Airport (LTBA) and Istanbul Airport (LTFM) during the transition period and after the transition period were announced as follows: 45 hourly process from LTBA to LTFM; 05 2019 00 00 06 2019 21 00 45 45 XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX In this XNUMX hourly process; Istanbul Ataturk Airport and Istanbul Airport (LTFM) will only be open to the base of the base carriers. XNUMX will be operated with hourly reduced capacity at Istanbul Atatürk Airport and Istanbul Airport.

Ataturk Airport, 7 April and 00.00 as scheduled and scheduled domestic and international commercial passenger transport will be closed.

29 was planned to be transported to Istanbul New Airport in October by President Tayyip Erdogan. However, the inauguration of Istanbul Airport was postponed to 31 March. In the past weeks, the news was planned to move between 3-2 April. 7 23 was canceled on the 20.00 flight from 22.00-6 to Istanbul Airport on February. The passengers of the canceled flights were also sent to Atatürk Airport.

Similar Railway News

Similar High Speed ​​Train News

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.