The construction of the line between Kirazlı Station and Başakşehir / Metrokent stations started in 2006. From İkitelli Industrial Station, shuttle service is carried out in the direction of Olympic Station. There are even 16 stations, with an approximate length of 11 km. In addition, there are warehouse and workshop buildings in the Olympic campus.

SEFER INFORMATION

The line has the potential of 70.000 Passenger / Hour on the route where it was built. The Kirazli-Olympic-Basaksehir Metro Line, located at the 11 station, is open between 06.00 and 00.00.

STATION STRUCTURES

The stations have 8 meter long platforms that allow operation with 180 trains. Mahmutbey Station was built with an additional 3rd road that allows car parking. The Olympic Station is constructed with 2 platforms - 3 lines, 2 medium platforms and 4 lines that allow transfer on the concordant floor of İkitelli Industrial Station. All stations of the line are built as tunnel / underground stations.

The workshop and depot area within the Olympic campus are built on approximately 70.000 m² and the vehicle capacity of the facility is 120. The workshop building with maintenance units consists of an indoor area of ​​10.000 m².

Line tunnels are double tube. Between Kirazlı - Başakşehir / Metrokent, TBM and İkitelli Industry - Olympic were opened with NATM method.

SYSTEM SAFETY AND SAFETY

Scenarios were prepared against all kinds of negative situations that may occur in the Metro line and simulations were made for these scenarios and solution plans were prepared. With the cameras in the stations, the system is constantly monitored, controlled and controlled by uniformed security personnel.

The system, built with the latest technology, has an interactive (self-adjusting) fire safety system. All equipments used in the construction of the line are selected from high temperature resistant and toxic gas-free materials. In order to ensure safe evacuation of passengers in the event of a fire, there is a smoke control and evacuation system that has been tested according to all scenarios.

The signaling, scissor and vehicle system of the line and storage area is fully automatic and can be operated manually if needed.

The energy supply of the system is made from two different points. If both supply points are disabled, the 15 generators will be activated within seconds and all trains reach the nearest station and can evacuate their passengers. In case the power supply is not provided and the generators are disabled; The lighting system and electronic control systems can be fed through uninterruptible power supplies for 3 hours.

INTEGRATION

At Kirazlı Station, transfer can be made to M1B Yenikapı - Kirazlı Line. At İkitelli Industrial Station, transfer to the Olympic shuttle company can be made by switching to the other platform area without leaving the system. With this transfer, access to the Greater Istanbul Bus Terminal and the Sur can be provided from the Başakşehir area.

CHERRY-OLYMPIC-BASAKSEHIR METRO STOPS

Metrokent
Başak Houses
sites
Turgut Özal
İkitelli Industry
Istoc
mahmutbey
Yenimahalle
Kirazli
Ziya Gökalp Neighborhood
Olimpiyat

* Passengers traveling to Ziya Gökalp Neighborhood and Olympic directions must transfer from İkitelli Sanayi station!

Be the first to comment

Leave a response

Your email address will not be published.


*