Yıldırım Beyazıt University - Rod Rail System Connection Surveying Design and Engineering Services Tender Result
2018 company was awarded the tender for the Yıldırım Beyazıt University - Bar Rail System Connection Study and Engineering Services Project with the 189343 / 8.452.654,00 KİK cost of approximately 6 / 3.948.000,00 KİK of the General Directorate of Infrastructure Investments of the Ministry of Transport, Maritime Affairs and Communication. AND TRADE. Inc. + ASTUR CONSTRUCTION AND TRADE. Inc. + KALYON CONSTRUCTION SAN. AND TRADE. Inc. joint venture.
Tender Approximately 16 km long Rail System Survey Project works. The duration of the work is 365 (three hundred five) calendar days from the place delivery.
Be the first to comment