Türel: “3. We Aim to Transport Passengers in March at Etap Rail System "

tura 3 stage rail system aims to transport passengers in March
tura 3 stage rail system aims to transport passengers in March

In the Vassak-Otogar stage of the 3. Stage Rail System Project, President Menderes Türel stated that the test runs started, and that they aim to carry passengers in March. Türel said, m Our efforts to bring many important projects to Antalya will continue after 2019. We do if we promise. During this period, the metro is no longer suitable for Antalya, Bu he said.

Antalya Metropolitan Municipality Mayor Menderes Türel was the guest of the Okra Soup event organized by Antalya Konyalılar Association. Konya Metropolitan Municipality Mayor Uğur İbrahim Altay and Konya Chief Public Prosecutor Ramazan Solmaz also attended the event. Addressing the members of the association at the event, President Türel said that they had the honor of having signed many firsts in Antalya. Reminding that Antalya's airport entrance was in a state of prime during the first mayor period, Türel said, “There was neither landscape nor green area. Antalya's traffic was locked. Sewage only existed in one third of Antalya. Some mayors do not prefer infrastructure works. It is quickly forgotten. But we are exceptions because we think that the country will come. When we make the infrastructure, we save the future of the city. I said that if Antalya will win everywhere for him, Menderes Türel is willing to lose yesterday. ”

3.Etap We aim to carry passengers in the Rail System in March

X Our trial voyages are held in the evening hours, X said Türel, who has made the 3 km Varsak-Otogar stage in the 16. Stage Rail System Project. We aim to carry passengers in March. We have completed the 18-kilometer Meydan-Expo second stage rail system line in a period of 5.5 months. This is a world record. 2018 3 as of the month of September. We've hit the Varsak line at Etap. 16 3 kilometers. In the first part of the stage trains started to walk. 4-4.5 months, such as completing the world record by almost breaking the new ones, "he said.

27 intersection complete

President Türel stated that the 27 storey junction was put into service during this period of his time in Antalya.: Right next to us, there is a bridge junction with the biggest junction of Antalya. 4 is an intersection with floors. 2 miles is an important intersection service through the underground tunnel. In the first period of Antalya, the first-story bridge intersections in the history of Antalya were also supported with the support of the people of Antalya. 4 months, such as we put into service. We provided relief in the areas where Antalya traffic was locked. On the one hand, we have succeeded in bringing the modern public transportation rail system, which we call light metro, to Antalya at a great pace. Bir

Antalya has won in our time

President Menderes Türel said that they added another 11 kilometer to the 44 kilometer rail system line that he implemented in his first period and added: Varsak'dan when you want to the Faculty of Medicine, if you want the Court House, if you want to Research Hospital, or if you want to light the airport, you can give your hand to Aksu, wherever you want, you can go to the rail system. We saw these services in Antalya when we served in Antalya. But unfortunately in the period of service at the point of service in a barley in Antalya could not progress. The 55-2009, one of the 2014 intersections that we have not been on duty in the first period, could not even add one kilometer to the 11 kilometer rail system line. So Antalya has won in our time. But, unfortunately, we lost it during our absence. 11 has almost lost 5 year after year. X

No more subway to Antalya

President Menderes Türel emphasized that his efforts to bring many important projects to Antalya will continue after 2019 and said UM We promise to do it but we do not promise anything that we cannot do. That's why I am now in favor of the metro to Antalya. Lara Kundu'a large port, a branch of the Varsak'a extending from the bottom of an underground line to the 25 km very quickly think we will start to talk.

Be the first to comment

Leave a response

Your email address will not be published.


*