Question Proposal for Subway Lines in Istanbul

Question line for metro lines in Istanbul
Question line for metro lines in Istanbul

Istanbul Metropolitan Municipality Council members with CHP, the ongoing construction of the ongoing subway lines in the question of whether the work has been asked. The question given to the Presidency of the IMM Parliament was referred to the IMM Presidency in order to be answered.

According to the news of Mehmet Demirkaya, Bakirkoy-Bagcilar Kirazli and Atakoy-Ikitelli subway lines in connection with a group of CHP members of parliament, İBB Parliament Presidency gave a question. The proposal of the IMM Municipality to respond in writing was referred to the IMM Presidency by the IMM Parliament.

The proposal bearing the signatures of Seyit Ali Aydoğmuş, Mehmet Berke Merter and Hasan Tapan from the Republican People's Party (CHP) was read by Aydoğmuş at the IMM Parliament. In the proposal, the work of Bakırköy-Bağcılar Kirazlı and Ataköy-İkitelli metro lines has not been done for a while and claims were made that the works were slowed down because the payment was not made to the contractor.

The CHP members, who claimed that many roads were closed to traffic due to the metro works, and that the delay caused the distress of the citizens to be extended, asked the following questions to be answered:

“Do you have stopped or slowed metro projects? What are the reasons for the delay of metro projects? Is there an allowance for the 2019 budget for our rail system projects for economic reasons? Is the employee's personal rights paid in the subway constructions which were stopped by the IMM due to the economic difficulties of the contractor? Gerek

The motion of the question given to the Presidency of the IMM Parliament was taken from the construction sites of some subway constructions.

Source : I www.haberturk.co

Current Railway Tender Schedule

Mon 16

Tender Notice: Public Transportation by Sea

September 16 @ 10: 00 - 11:00
Organizer: IMM
+90 (212) 455 1300
Salt 17
Salt 17

Tender Notice: Rubber Coating of Level Crossing at Tekirdağ-Muratlı Line

September 17 @ 14: 00 - 15:00
Organizer: TCDD
444 8 233
About Levent Elmastaş
RayHaber editor

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.