In 2015, 4, published by the Sivas Municipality, presents the reasons for the delay in a news high-speed train project in the September magazine. The magazine, which is also shared with the below images, is published by Sivas Municipality Aşağıda
President Sami Aydın for the high-speed train project in the south of the line with the efforts of the line, will be made into the station building in the magazine that said, ğ President Aydın took the demands of the residents of Ankara. The high-speed train's in-town crossing route went south. The station building will be built on the campus entrance of Cumhuriyet University. This route came up with the division of the city into two, and the Mayor Sami Aydın opposed the route to cut the highway at the 23 point between the south and the north of the city, and asked for the route to be moved to the north or south Bu.
In addition, the geçiş güney high-speed train crossed the inner city crossing to the south. The new route to the zoning plan that process the Municipality of Sivas was prevented from dividing into two. The road construction of the high-speed train will be completed in 2018 and the Sivas-Ankara, Ankara-Istanbul connection will be completed. ”It was stated.
President Recep Tayyip Erdogan, the messages sent by Cice through the Cimer, and high-level politicians after the troubles conveyed to the President, Sivas, the rally, "the speed train will ask the account of those who delay," he said.
In addition, Aydın described how he changed the route on a TV show with the following images and what he did about the high-speed train after being elected as the Mayor.
Nowadays, the route to the last state before 2015, which is not included in the subject, is being replaced by the old station.
In the meantime, the route and the station would not have been the subject of changes such as rapid train routes would have already started in Sivas.
Source : I www.buyuksivas.co
Be the first to comment