President Karaosmanoğlu, Köseköy Junction Investigated

baskan karaosmanoglu has reviewed kosekoy
baskan karaosmanoglu has reviewed kosekoy

Union of Turkish World Municipalities (TDBB) and Kocaeli Metropolitan Municipality Mayor İbrahim Karaosmanoğlu, 110 meter closed tunnel (branch-out) 500 meter open part of the construction of the ongoing work at the Kartepe Köseköy Junction examined the site. Metropolitan Municipality Secretary General Ilhan Bayram and Deputy Secretary General Alaeddin Alkac also accompanied by examination in the study of day and night quickly Karaosmanoğlu voicing continued, "Kartepe Köseköy junction, will fulfill an important service on D-100" he explained.

20 KILOMETRICAL PART IS UNINTERRUPTED
Expressing in the examination that a pedestrian bridge will be built with the project main road of 300 meters and the north and south side roads at 2 meters, President Karaosmanoğlu also noted that 600 thousand hot asphalt, 1 thousand square meters of parquet, 35 thousand 11 meters of curbs will be used in the intersection work. . Emphasizing the importance of making the 10-kilometer section of the D-500 Highway between Kuruçeşme and Özdilek uninterrupted, the study emphasized that eliminating traffic congestion is also a great deal for the region. kazanIt was stated that I am.

TO GO ON TO CAR WEAR
Since it is one of the important points in D-100 since it provides connection to the district center of Kartepe, Köseköy intersection will be an integral part of the district divided by D-100. The car park will also prevent traffic congestion from traffic lights. The side roads will provide the exit from the district center. Köseköy Junction will eliminate the traffic load caused by heavy vehicles entering and leaving the TEM highway. The side roads at the crossroads will be connected to Sabancı Junction. The side roads will have three lanes with turn strips. Inside the tunnel, 2 is the 2 ribbon.

 

Similar Ads

Be the first to comment

Comments