President Karaosmanoğlu, Köseköy Junction Investigated

baskan karaosmanoglu has reviewed kosekoy
baskan karaosmanoglu has reviewed kosekoy

Union of Turkish World Municipalities (TDBB) and Kocaeli Metropolitan Municipality Mayor İbrahim Karaosmanoğlu, 110 meter closed tunnel (branch-out) 500 meter open part of the construction of the ongoing work at the Kartepe Köseköy Junction examined the site. Metropolitan Municipality Secretary General Ilhan Bayram and Deputy Secretary General Alaeddin Alkac also accompanied by examination in the study of day and night quickly Karaosmanoğlu voicing continued, "Kartepe Köseköy junction, will fulfill an important service on D-100" he explained.

20 KILOMETRICAL PART IS UNINTERRUPTED
Stating that the project main road will be constructed at 300 meters, and 2 and 600 meters at the north and south side roads, President Karaosmanoğlu said that 1 thousand hot asphalt, 35 thousand square meters of pavement and 11 meters of curb will be used in the intersection study. . In the examination, which emphasized the importance of making the 10-kilometer section of the D-500 Highway between Kuruçeşme and Özdilek uninterrupted, it was stated that clearing the traffic jam is a great gain for the region.

TO GO ON TO CAR WEAR
Since it is one of the important points in D-100 since it provides connection to the district center of Kartepe, Köseköy intersection will be an integral part of the district divided by D-100. The car park will also prevent traffic congestion from traffic lights. The side roads will provide the exit from the district center. Köseköy Junction will eliminate the traffic load caused by heavy vehicles entering and leaving the TEM highway. The side roads at the crossroads will be connected to Sabancı Junction. The side roads will have three lanes with turn strips. Inside the tunnel, 2 is the 2 ribbon.

 

Be the first to comment

Leave a response

Your email address will not be published.


*