Flash 'Kanal Istanbul' Statement by the Minister of Transport and Infrastructure

Transport and Infrastructure Minister Mehmet Cahit Turhan, President Rexhep disclosed to the public by Tayyip Erdogan, 100 Days Fulfillment Program in stating that they accelerate efforts for Turkey's pride projects, "the most important items of the program with Turkey and Western Europe-Far East region an important transfer center Works at the Istanbul New Airport, which will turn into a full capacity, continue on a 7/24 basis. The first phase of our airport will be operational on October 29. ” said.

General Directorate of Turkey's prestige project and Highways to channel the completion of the study project work in Istanbul and Exiting the announced tender for construction of Highways (KGM) and the Infrastructure Investment Directorate-General (AYGM) studies Turhan emphasized that continued at full speed after the completion of the work within 3 months He said that it is planned to announce the tender.

Turhan made an evaluation regarding the “100-Day Action Program of the Ministry of Transport and Infrastructure”.
President announced to the public by Erdogan and the program's most important expressed in the article Istanbul New Airport first phase of Turhan reminiscent will enter service on October 29, Turkey's project, has announced it will make an important transfer hub in Western Europe-Far East.

Turhan, the 10,2 billion euros in the giant project, including investment and 22,2 billion euros including VAT, indicating that the point of the airport, 3 thousand 500 aircraft will take off-and-take-off day.

73 billion pounds will contribute to the economy 225 thousand people will be employed at the airport striking attention Turhan, all the stages of the new airport passenger capacity can be up to 200 million, he said.

"KGM AYGM AND RUNNING FOR TURKEY'S PRESTIGE PROJECT"
Turhan, who was introduced as the “crazy project” by President Erdoğan in 2011 and is one of the preliminary projects of the 100-Day Executive Program, stated that the works were accelerated for the implementation of the Kanal Istanbul Project, on the European Side of the city, He explained that the Black Sea and the Sea of ​​Marmara will be connected.

Turhan said that approximately 45 kilometers of Canal Istanbul Project will be large enough to affect the economic, social and urban structure of the region, and that the route of the channel is determined as Küçükçekmece-Sazlıdere-Durusu corridor within the scope of the survey project and consultancy service.

The project, about 5 years of the construction phase, the minimum economic life of the Turhan pointing planned to be 100 years, "for among the most important projects of the Program of Turkey's prestige project for the completion of the Canal Istanbul survey project work and Exiting the announced tender for construction of both KGM both AYGM 's work continues at full speed. ” he spoke.

Geographical, geotechnical, hydrogeological and ecological studies, as well as navigation and in-house traffic simulation applications, the project's EIA process, construction and operation of the preparation of financial model expressing that the continuation of the work after the completion of the 3 monthly period in the completion of the project work on the completion of the survey in Istanbul and the tender stressed that an attempt to be announced.

“MEGA WILL TAKE THE TENDER OF THE PROJECT WITH THE BOT MODEL”
Turhan reminded that the 3-storey Grand Istanbul Tunnel Project, which is known as the “mega project”, is the first in the world, and that the tunnel needed by the Fatih Sultan Mehmet Bridge and the highway tunnel needed by the Fatih Sultan Mehmet Bridge axis will pass through a single tunnel.

9 will integrate the different rail system line, and the project is completed by the transfer of 6,5 million people per day transferring the project is planned to transfer Turhan, the project is ongoing work, a build-operate-transfer (BOT) model will be announced by the tender said.

“THE NUMBER OF SERVICES IN E-GOVERNMENT WILL INCREASE TO 3 THOUSAND 500”
Turhan stated that 38 new services will be integrated into the e-Government in a 100-day period, with the number of users exceeding 135 million.

Turhan, 5 thousand 328 more than the 120 mileage will be made in order to increase traffic safety and provide economic benefit, 2 kilometers to the new highway, the network will be transferred to 777 thousand XNUMX kilometers, he said.

Pointing out that the works are continuing for the tender of 246 highway projects with a total length of 2 kilometers, Turhan said, “We are conducting the tender of Aydın-Denizli and Mersin-Taşucu highways.” used the expression.
Turhan, the program within the framework of the 893 hot bitumen bitumen hot mixture coating to increase the safety and comfort of the highway, 30 mile highway tunnel 21 mile length bridge and viaduct will be completed.

Underlining that 120 km of line laying will be completed on Ankara-Sivas High Speed ​​Railway, Turhan is 230 kilometers long. Halkalı-Kapıkule Express Railway construction tender, the high-speed train will be brought together with Europe, he added.

“990 SETTLEMENTS WILL BE COVERED BY 4,5G”
Pointing out that the scope of “Universal Service” will provide 990G mobile coverage to 4,5 settlements, Turhan stated that domestic and national 5G and beyond studies will be initiated.

Turhan also reminded that the İdris-i Bitlisi Ferry built for Van Lake will start to operate, and said that 2 logistics centers with a capacity of 596 million 2 thousand tons will be put into operation in Mersin and Konya.
Minister Turhan said that they will work intensively for the construction of the Tokat Airport terminal building and the construction of other projects within the scope of the program, including the construction of a total of 73 kilometers of city rail system in Konya, Izmir, Istanbul, Ankara and Kayseri and the purchase of 248 vehicles. .

Be the first to comment

Leave a response

Your email address will not be published.


*