The tender for the purchase of IMM Metro Vehicles



Buy Metro Tool
ISTANBUL METROPOLITAN MUNICIPALITY RAILWAY SYSTEM DEPARTMENT EUROPEAN SIDE RAIL SYSTEM DIRECTORATE

The purchase of 272 Unit Metro Vehicle and Commissioning of the Kirazli Ring Rail Transport System will be procured under the open tender procedure according to the article 4734 of the Public Procurement Law No. 19. Detailed Information about the auction can be found down below:
Tender Registration Number: 2018 / 144625
1 of Administration
a) Address: Istanbul Metropolitan Municipality Additional Service Building, European Side Rail System Directorate, Osmaniye Mah. Çobançeşme Koşuyolu Boulevard No: 5 Floor: 2 34568 BAKIRKÖY / İSTANBUL
b) Telephone and fax number: 0212 449 41 75 449 41 84 0212 449 41
c) E-mail Address: avruparaylisistem@ibb.gov.tr
ç) The internet address of the tender document (if applicable): https://ekap.kik.gov.tr/EKAP/

2-The subject of the tender
a) Quality, type and quantity:
68 Qty (with 4 instrument) subway array, Total 272 Qty Subway Tool
Detailed information can be obtained from the administrative specification contained in the tender document in EKAP.
b) Place of Delivery: Istanbul Metropolitan Municipality
c) Delivery dates: Delivery schedule of arrays; The delivery of the entire 272 vehicle will be completed in 45 (forty-five) months. Delivery of arrays is 18 from the date of commencement. start on the month and 45. will be completed at the end of the month. 30 (thirty) days for the field tests and 60 (sixty) days for the test run will be used after the final series. This delivery program; - 90 and 18,19,20,21,22,23,24,25. 26 (2 vehicle) packets in each of the months - 8 and 27,28,29,30,31,32,33,34,35,36,37. 38 consecutive sets (3 vehicles) in each of the months - 12 and 39,40,41,42,43,44 will be determined by the Contractor to deliver 45 consecutive series (2 vehicles) in each of the months. These conditions must be fulfilled by the contractor. The trial operation will be carried out for the lines where the vehicles under this scope will be operated. When the delivery of the vehicle is in progress, any line in which the vehicles under this work will be ready and the number of vehicles that will be used in the delivery of the vehicles to be used in this work is reached and the number of the vehicles to be used is reached; trial operation of the said line will be started. In this case, the duration of the trial operation of that line shall be in the vehicle delivery process, but no change in the period of the 8 (sixty)-day trial run which is to be used after the completion of the field tests and the delivery of the above-mentioned and final series. The Contractor shall submit to the approval of the Contracting Entity on the 60 (sixty) calendar days following the entry into force of the contract (vehicle and factory tests) and trial operation related detailed work program. The contractor; following the signing of the contract, the project plans to be realized within the scope of the contract, design, supply planning, production preparation, production-assembly and all related tests (equipment-vehicle-completed vehicle-field type / routine tests) It will offer.

3- Tender
a) Location: Istanbul Metropolitan Municipality Additional Service Building, Tender Affairs Directorate Tender Hall, Osmaniye Mah. Çobançeşme Koşuyolu Bulvarı No: 5 Floor: 4 Bakırköy / İstanbul
b) Date and time: 16.07.2018 11: 30

teknik_sartnamesiz_ihale_dokumani_xnumx_xnumx

Tender notices published on our website are for information only and do not replace the original document. The original document is valid for the differences between published documents and original tender documents. Our sources are Official Gazette, Daily Newspapers, Public Institutions and Institutions web pages.