Adana Mersin Railway Construction Works Tender Prequalification Application Results

tcdd transportation
tcdd transportation

Adana-Mersin III. and IV. The Pre-qualification Applications for the construction of the line and the rehabilitation of the I. and II. Lines (including the Çukurova Airport connection) (ESTA) Construction Works Tender were collected.

The Turkish State Railways Administration's 2018 / 213917 NCC Adana-Mersin III. and IV. 26 applied for pre-qualification for the construction of the line and the 1st and II.Hat rehabilitation works (including connection to Çukurova Airport) (ESTA). 8 will be invited to submit a bid for the candidates listed in the pre-qualification specification.

Companies that apply for prequalification are as follows;

  • AGA ENERGY + KOLIN CONSTRUCTION + DBH ROAD
  • ALSİM ALARKO
  • BAYBURT GROUP + ORIGINAL BUILDING + SENBAY MADENCILK
  • BESTAŞ BUILDING + SILAHTAROGLU ROAD CONSTRUCTION
  • BİMHOLL CONSTRUCTION + YEDİGÖZE CONSTRUCTION + HAZARYOL CONSTRUCTION
  • CENGIZ CONSTRUCTION + MAKYOL CONSTRUCTION + DOGUS CONSTRUCTION
  • CHINA MACHINERY + ÖZKAR CONSTRUCTION
  • CHINA RALWAY TUNNEL GROUP + ADFA CONTRACTING
  • DALGIÇRAY CONSTRUCTION + DEKOVİL INTEGRATED SYSTEM + ATZ ENERGY + NEORAY CONSTRUCTION
  • DENTAŞ INTERNATIONAL. OHİTAN CONSTRUCTION + MAPAVRI CONTRACTING
  • EFECEMLER CONSTRUCTION + METROSTAV ANKARA CONSTRUCTION + STEEL CONTRACTING
  • GENÇ CONSTRUCTION + MON CONSTRUCTION + BERGIZ CONSTRUCTION
  • GTSM + PROYAP CONSTRUCTION
  • GULERMAK HEAVY INDUSTRY + NUROL CONSTRUCTION + GURIS CONSTRUCTION
  • IC İÇTAŞ CONSTRUCTION + ASTUR CONSTRUCTION
  • IRCON INTERNATIONAL + LİMAK CONSTRUCTION + ERG CONSTRUCTION
  • KMB METRO CONSTRUCTION + ULTRA TECHNOLOGY + KUTLUTAŞ MÜT. + HARMONY STRUCTURE
  • METING RAIL SYSTEMS + MET-GÜN CONSTRUCTION
  • NORINCO INTERNATIONAL + HRI CONSTRUCTION
  • ORION LTD STI + FERNAS CONSTRUCTION
  • PERS BUILDING + IMAGE INFRASTRUCTURE + ASMIN CONTRACTING
  • RBI CONSTRUCTION
  • REGION ENERGO SERVICE + ÖZKA CONSTRUCTION + KİSKA-KOM CONSTRUCTION
  • ROSINTERSTROY A.S. + TAV TEPE AFKFEN INVESTMENT + UĞURSAL ELECTRIC
  • SNM GES ENERGY + AÇILIM CONSTRUCTION
  • SSC YOL CONSTRUCTION + İNTEKAR CONSTRUCTION + DEMCE CONSTRUCTION + METALEKS CONSTRUCTION
  • STROYTRANGAZ A.S. + MAPA CONSTRUCTION

Tender The infrastructure and superstructure of all four lines, some art structures and superstructure as well as electrification, signaling and telecommunication production of all lines are included in the scope of the General Disclosures document in connection with Çukurova Airport Connection. The duration of the work is 730 (seven hundred and thirty) calendar days from the place delivery.

Be the first to comment

Leave a response

Your email address will not be published.


*