Polatlı-Konya Yht Line Yht and Conventional Line for the separation of the construction work

Polatli-Konya Yht Line 181 + 500 211 300 XNUMX and Conventional Line Between the Separation Works

2018 / 179950 BIK of the Turkish State Railways 1.187.600,75 TL and the approximate cost 1.678.677,15 TLolan Polatlı-Konya Yht Line 181 500 211 300 16 1.188.240,00 2 XNUMX XNUMX BIMTEK TECHNICAL SERVICES PAZ. AND TRADE. LTD. Sti. company has won. XNUMX, which participated in the tender, bid below the limit.

Production and installation of flat fence pole from 7269 pieces of galvanized pipe - 32700 is made of square galvanized cage wire fence. The duration of the work is 180 (one hundred and eighty) calendar days from the place delivery.

Ads

Similar railway news

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.