Railroad Line Railroad Crossings to be made as a result of the tender

Malatya-Çetinkaya Line Km: 2 + 218 and Fevzipaşa-Diyarbakır Line Km: 254 + 565 railings on highway overpasses Tender Result

2018 / 48784 TL number of boundary value of 1.248.486,22 TL and cost of 1.798.642,99 TL of 2 TL and XMUMX + 218 and Fevzipaşa-Diyarbakır Line Km: 254 + 565 rail crossing of highway overpasses at 58 1.251.392,50 HCA CONSTRUCTION CO. LTD. 27, which participated in the tender, bid below the limit.

Malatya-Çetinkaya Line Km: 2 + 218 and Fevzipaşa-Diyarbakır Line Km: 254 + 565 to the road overpass 5308 pieces Epoxy anchor (12-18 mm diameter), 2625 m Stainless chromed pedestrian railing works. The duration of the work is 90 (ninety) calendar days from the place delivery.

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.