Last Stages Are Passed In Konak Tramway

One of the last stages of the line production of Konak Tramway, which is being built by Izmir Metropolitan Municipality, is being passed. 15 As of November Wednesday, transportation from the former Tax Office to the Üçkuyular Port Interchange will be closed to traffic on a X one-sided X basis. During this time, the connection between Mustafa Kemal Beach Boulevard and Fahrettin Altay Junction will be provided via 19 / 1 Street in Güzelyalı, Mithatpaşa Street.


Izmir Metropolitan Municipality's environmentalist, economic and comfortable urban transport is carried out in the name of the tram project in the Konak section is now the last connections on the line. In this context, for the works that are planned to be completed on the official Tufan Street, which is still being closed to traffic, Şehit Major Ali is going to be completed in the direction of the Üçkuyular Pier Interchange from the old Tax Office and will be closed to traffic as ği unilateral atılmış since November. In this process, access to Mustafa Kemal Beach Boulevard from Fahrettin Altay Junction will be provided via the 15 / 19 Street via Güzelyalı via Mithatpaşa Street.

In the same area, the studies to be carried out in front of the Air Training Command for the line connections between Mustafa Kemal Beach Boulevard sea side and Ali Official Tufan Street will be implemented in the 2 stage. All manufacturing in the region will be completed in November.



Be the first to comment

Comments