Minister Arslan: 40 percent of our country's population met with YHT

arslan gnomes
arslan gnomes

Minister Arslan: 40 percent of our country's population met with YHT: The 10th Transist International Istanbul Transportation Congress and Fair was held on 02-04 November 2017.

10 with the participation of Ahmet Arslan, Minister of Transport, Maritime Affairs and Communications. Transist International Istanbul Transportation Congress and Fair opening ceremony, our country and the international sector in the transport sector managers / organizations serving in the university, local government, non-governmental organizations, maritime, road, rail and rail system transportation products supply / service company representatives She attended.

“It is very important to talk about public transportation in Istanbul, which crosses two continents by sea”

In his opening speech, UDH Minister Ahmet Arslan emphasized that it is very important to have a program that discusses public transportation in Istanbul, which is the only city in the world that connects two continents and which is the only city in the world to cross the sea. very important. However, it is more important not to talk and leave it there. I wish success to our Metropolitan Mayor, thank you, congratulate. We need to update the work, how much of what you have been able to do, how much of your plans serve tomorrow, it is important to talk about. It is very important to discuss this issue with the institutions, private sector and universities which are the stakeholders of this business. ”

Sağlamak It is very important to ensure the integration between the transportation modes ”

Arslan also said, “If you live in Istanbul, if you are growing in Istanbul, transportation is a part of your life. I came to Istanbul in 1977. Unfortunately, we were having huge problems from time to time. It was very important to find solutions to the transportation problems of Istanbul and to provide solutions by integrating transportation types. As someone who has these problems and is a stakeholder in their solution, I say; If you are solving the public transportation problem of a city like Istanbul, you can find solutions all over the world. As a result we get from Istanbul experience by living and knowing the importance of ensuring integration between transport modes we get from Istanbul is Turkey's transport and communications solutions to the universities producing again, and we cooperate with the private sector side. When we take this responsibility, we said that under the auspices of our President, our Prime Minister, Mr. Recep Tayyip Erdogan, under the leadership of our Prime Minister, Mr. Binali Yıldırım, we should make a plan, we should set goals and ensure the integration of transportation types while walking to these goals.

What have we done that day in Turkey today? First of all, we have determined “Transport Master Plan Strategy”. We worked with many public institutions / organizations and many university teachers. We have set our future goals. We brought them to the planning stage. How should transportation access be in cities with the 10th Transportation Council, how should transportation access be in our country, how should these be integrated with the transportation corridors in the world? We put them on the table. With the planned work, we have taken a great distance in all types of transportation. " said.

Yüzde 40 of our country's population met YHT ”

Fate of almost abandoned railways Arslan underlined that they reinstate government policy since 2003, the average per year until 1950 134 km railway was made, from 1950 to 2003 between the years said, noting that this figure is 18 kms fall: "Turkey is today the world 8 It is the 6th high speed train operator country in Europe. We introduced high-speed trains to Ankara, Konya, Eskişehir, Kocaeli, Sakarya, Bursa, Bilecik and Istanbul, where 40 percent of our country's population lives. We were not satisfied with that, we renewed about 11 thousand kilometers of the 10 thousand kilometers of railway network abandoned to its fate. We raised their standards. We more than doubled the signal and electrical line length. ”

“4 has built more than a thousand km of new railway line and 5 has built a thousand km of new railway line et

Currently, 2000 kilometer high speed, 1300 kilometer speed and 700 kilometers of conventional lines, including more than 4 thousand kilometers of new railway line construction work is ongoing and 5 thousand kilometers of new railway line survey studies are ongoing Arslan, entegre Other transport types However, the railway connection of these railway lines to ports, organized industrial zones, large factories and large load centers is very important. In order to move from transportation to logistics, we are building logistics centers within the framework of the Master Logistics Master Plan ”and we will have the opportunity to increase the load amount to 2.5. Currently, 8 is in operation. 9. We are opening our Logistics Center in Erzurum. Construction work continues at 5 location including Kars, Konya. Proje The project studies are continuing for 21. ”

“The missing link of the Middle Corridor was completed with BTK”

Arslan, who gave information about the Baku-Tbilisi-Kars railway, which was inaugurated on 30 October 2017 and whose first train successfully reached Mersin, continued as follows: "The BTK railway line is a platform that concerns all countries from London to Beijing. It is a complementary project. Pride for us is a pride for our country. It is a very important project that we present to the world. I hope it will be auspicious for our country, region and humanity. Because we have completed the missing link of a very important chain. Which chain? The strength of that chain is equal to its weakest link. Besides, it had no ring. The chain had no power… The chain got stronger. We've completed the missing link. We built this railway thanks to our belief in the rail system and the railway. "

Geb Both sides of Gebze HalkalıWe will integrate '

Arslan pointed out that the efforts to bring the suburban systems on both sides of Istanbul to the metro standard in Marmaray quality, integrated with other rail systems, continue day and night, “We will complete the entire system before the end of 2018. Both sides from Gebze Halkalı'We will integrate them with each other and put them into service of Istanbulites. " he spoke.

“YHTs will go to Haydarpaşa, European side”

Emphasizing that a third line was built next to the metro line, Arslan said, “High-speed trains departing from Ankara, Sivas, Konya will be able to cross to the European side by using Haydarpaşa or Marmaray. Again, during the hours when passenger transportation is not available, freight trains departing from China from Kazakhstan will be able to go to Europe by Marmaray. Thus, it will serve both local, intercity and international transportation ”.

Arslan stated that projects are being carried out in order to integrate transportation systems in many cities besides Istanbul and solutions are produced as a solution partner.

Arslan pointed out that the fair will provide benefits for localization and nationalization and wished that the congress and fair would be auspicious.

TCDD General Manager İsa Apaydın He also gave information about the investments of the General Directorate and the liberalization process of railway transportation.

Be the first to comment

Leave a response

Your email address will not be published.


*