Kayseri's Master Plan of Transportation Completed

A delegation from the Ministry of Transport, Maritime Affairs and Communications came to Kayseri for Belsin-YHT Rail System Line.

Kayseri Metropolitan Municipality completed the Transportation Master Plan for the future of Kayseri. A delegation from the Ministry of Transport, Maritime Affairs and Communications examined the master plan with the Mayor Mustafa Çelik and the area where the new rail system line in this plan will be constructed.

Metropolitan Municipality, Transport Master Plan, also called the Urban and Near Environment Transport Master Plan for approval, Ministry of Transport, Maritime Affairs and Communications General Directorate sent to the General Directorate. In addition to the existing 34 km rail system line, the Transportation Master Plan envisions the 7 km Belsin-Anafartalar High Speed ​​Train (YHT) Railway Station Line and the 19 km High Speed ​​Train Station and Talas-Mevlana Rail Line. .
For the approval of the master plan, the delegation headed by Hülya Akboyraz, Ministry of Transport, Maritime Affairs and Communication, led a delegation in the presence of the Mayor Mustafa Çelik and in front of the Regional Hospital where the tram line will be constructed.

GÖR SEE THE NEEDS OF IMPORTANT, MAKING THE PLANNING “

Mayor Mustafa Çelik stated that the Transport Master Plan was completed and ı Our Ministry authorized the ministry to examine the master plan on land. What is important is to anticipate and anticipate the needs. While we were doing the Bekir Yıldız Boulevard in the area we examined, we thought that we should solve the problems related to transportation before opening the Regional Hospital. Hopefully, the transportation problem will be solved by the rail system and rubber wheeled vehicles along with the rail system line to be made by the Ministry of Transportation. İn

After the approval of the Transportation Master Plan, the Belsin-Terminal-District Hospital-Nuh Naci Yazgan University-YHT Train Station that will pass through the Regional Hospital will be constructed by the Ministry of Transport and the Metropolitan Municipality. In addition, Talas-Anayurt and Asık Veysel Boulevard Rail System Line will be tendered to be completed by the Metropolitan Municipality within a short period of time.

Be the first to comment

Leave a response

Your email address will not be published.


*