Şaban Bülbül: "Even if the light rail system starts today, it will end after 10 years"

President Bülbül said, iyle Light Rail System Project is an important project for our city but 10 should be completed but the Transport Master Plan should be implemented as soon as possible in order to relieve the traffic. X In Trabzon, traffic was locked at many points of the city with expatriates and tourists flocking to the city. . Transportation problems occurred in many parts of the city, especially the traffic drivers and citizens trapped in the way of Değirmendere and Tanjant infuriated. Şaban Bülbül, Head of the Chamber of Mechanical Engineers, stressed that the Transport Master Plan should be implemented as soon as possible without waiting for the implementation of the Light Rail System Project.

TRAFFIC RELIEF
President Bülbül pointed out that the Light Rail System Project is a very important project for Trabzon but it is not a project that will solve the transportation problem in the city by itself. We have to solve the problems we have today with instant solutions. We need to relieve the traffic. In the case of general solutions, a Master Plan of Transportation is required for all areas of Trabzon. But unless this plan is done, this traffic problem will not be solved. Ama

TRABZON AND NEIGHBORING PROVINCES TR
Bülbül noted that the Master Plan of Transportation should be put into practice by the dynamics of Trabzon as soon as possible without wasting any time. 'The Master Plan of Transportation' includes both the boundaries of Trabzon and the certain boundaries of Giresun and Rize, both of which cover a certain part of Gümüşhane. highway, rail and freight transportation, housing roads, roads along with a plan taking into account all the values ​​are made, karayolu he said.

ALL POINTS CALCULATED
Bülbül continued his words as follows: “While solving the traffic problem not only in Kaşüstü, but also in Kaşüstü, it is necessary to plan the entrance of Arsin and Yomra. In addition, the entrance of Değirmendere should be planned at all points. In other words, a Transportation Master Plan should be prepared taking into account all points. It is necessary to consider all routes and points. This is called the high level Transport Master Plan. After doing this, it starts from certain points and when all of these are fulfilled, Trabzon will not have any transportation problems.

Source : www.karadenizdesonnokta.com.t is

Be the first to comment

Leave a response

Your email address will not be published.


*