İBB's escalator doesn't work

The escalator of the IMM does not work in any way: Ataköy-Şirinevler, which is an important connection point for public transportation, has been waiting for the metro and metrobus stops for a long time.

Every day tens of thousands of people use Ataköy-Şirinevler metro and metrobus stops, which are important ports. The escalator, which is an important option for the elderly, pregnant and disabled people who can be used for the transition to these stops, is waiting in the defective condition for more than a month.

The escalator, which runs parallel to the Ataköy-Bakırköy road, is frequently used by the citizens of the region and by the citizens who want to transfer from the bus to the metro and metrobus stops.

WALKING STAIRS WAS THE NON-STADIFIED LADDER

The escalator service is unavailable on the grounds that it has been malfunctioning for about 2 months. Therefore, instead of walking stairs that take the stairs instead of citizens are required to use the normal stairs. 2 for the stairs that can not be walked for the attention to the complaints made to the İBB White Table draws attention.

IMM: WE ARE WAITING FOR PARTS FROM ABROAD

The IMM officials stated that the citizens who applied to the White Table were expected to track the defect from abroad and that the fault could not be solved with this reason. In such a long period of time, the related statement of IMM, which cannot produce solutions to the problem, is as follows;

Bulunan For the escalator located at the Şirinevler station, a part supply period is expected. When the parts come from abroad, the fault will be corrected as soon as possible. We apologize for the inconvenience and thank you for your understanding. Verm

Source: White Agenda

Be the first to comment

Leave a response

Your email address will not be published.


*