Akçaray Tram Line is Covered with Concrete, Asphalt and Paving

Akçaray Tram Line is Covered with Concrete, Asphalt and Paving: Concrete, printing asphalt and paving stone works are carried on along the Akçaray Tram line constructed by Kocaeli Metropolitan Municipality. In the work done on the line, the area where the tram line is located is constructed according to the structure of the region.

3 KM AREA PRINTING ASPHALT

As a result of the studies, starting from the bus station, the work continues on the asphalt works on the tram line from the Yellow Mimoza Street to the Thursday Market area. Small bobcat asphalt machine that can enter the tram line in the work with the asphalt after laying on the line is pounded the desired shape is given.

CONCRETE LINE CONCRETE CONCRETE AND PARTY

In addition, the production of paving stone flooring continues. In the area between the courthouse and the Central Bank, parquet is manufactured. Also in the area between Gar and Seka Park, parquet was produced. The rest of the line was made of concrete.

Be the first to comment

Leave a response

Your email address will not be published.


*