Metro Vehicle for Istanbul Rail System

Metro Vehicle for Istanbul Rail System
ISTANBUL METROPOLITAN MUNICIPALITY RAILWAY SYSTEM DEPARTMENT ANADOLU SIDE RAIL SYSTEM DIRECTORATE



Dudullu-Bostancı and Mahmutbey-Esenyurt Metro Lines Rail Transportation Public Transportation System 120 Unit Metro Vehicle Supply and Commissioning Works will be procured under open procurement procedure according to the article 4734 of the Public Procurement Law No. 19. Detailed Information about the auction can be found down below:
Tender Registration Number: 2017 / 229012
1 of Administration
a) Address: Seyrantepe Metro Facilities Huzur Mahallesi Station Road Street 34396 SEYRANTEPE SARIYER / ISTANBUL
b) Telephone and fax number: 2123126515 - 2124554373
c) E-mail Address: anadoluraylisistem@ibb.gov.tr
ç) The internet address of the tender document (if any): https://ekap.kik.gov.tr/EKAP/

2-The subject of the tender
a) Quality, type and quantity:
30 set (4 vehicle) subway series, Total 120 Qty Metro Tool (Distribution of vehicles by lines will be as follows:
Detailed information can be obtained from the administrative specification contained in the tender document in EKAP.
b) Place of Delivery: İstanbul
c) Delivery date: Delivery schedule of arrays; The delivery of the entire 120 vehicle will be completed in 20 (twenty) months. The delivery of arrays will start at 10.from the date of commencement and 20. will be completed at the end of the month. 30 (thirty) days for the field tests and 60 (sixty) days for the test run will be used after the final series. This delivery program, 90. 10 array (2 tool) per month, followed by 8 array (3 tool) and 12 every month. In the month, 20 will be determined by the Contractor to be delivered in series. These conditions must be fulfilled by the contractor. The trial business will be carried out separately for the lines of the vehicles under this work. When the delivery of the vehicle is underway, any line in which the vehicles in the scope of this work will be ready to be prepared and sufficient number is reached in order to perform the trial operation in the delivery of the vehicles to be used in that work and if requested by the Administration; trial operation of the said line will be started. In this case, the duration of the trial operation of that line shall be in the vehicle delivery process, but no change in the period of the 1 (sixty)-day trial run which is to be used after the completion of the field tests and the delivery of the above-mentioned and final series. The Contractor shall submit the detailed work program related to vehicle test (factory and field tests) and trial operation to the approval of the Contracting Entity within 60 (thirty) calendar days following the entry into force of the contract. The contractor; Following the signing of the contract, the project will present the projects related to design, supply planning, production preparation, production-assembly and all related tests in a clear and understandable manner. The duration of trial operation of Mahmutbey-Esenyurt Metro Line is 30 days and the duration of trial operation of Dudullu-Bostancı Metro Line is 120 days. The first 60 subway vehicle to be procured is planned for Mahmutbey-Esenyurt Metro Line and the remaining 80 subway car is planned for Dudullu-Bostancı Metro Line.

3- Tender
a) Location: Istanbul Metropolitan Municipality Additional Service Building Tender Affairs Directorate M.Nezihi Özmen Mah. Kasım Sk. No: 62 34010 Merter-Gungoren ISTANBUL
b) Date and time: 31.07.2017 - 11: 30

Tender notices published on our website are for information only and do not replace the original document. The original document is valid for the differences between published documents and original tender documents. Our sources are Official Gazette, Daily Newspapers, Public Institutions and Institutions web pages.