Konya YHT Station Will Be Opened In 2018

Konya YHT Station Will Be Opened In 2018: The works in YHT Konya Station, the construction of which has started, were examined on site.

Ziya Altunyaldız, President of the Parliament of Turkey, Turkish Parliament, Industry, Trade, Energy, Natural Resources, Information and Technology Commission, TCDD General Manager İsa Apaydın Together with Mr. YHT, he studied the works at YHT Konya Airport.

General Directorate of State Hydraulic Works (TCDD) İsa ApaydınSince the beginning of the high-speed train operation in Konya, the current railway station has not been integrated with the urban transportation axes, so it has been stated that the new YHT Gar location will be the center of the city distribution center as a result of the negotiations with the Konya Metropolitan Municipality upon the heavy demand from the passengers. Var Here we have a closed area of ​​about 30 thousand square meters. It has a 35 thousand square meter gar area with YHT Gar square. Here we will build a second garage worthy of our Konya. 3 floor, 117 parking lot around, 100 around the open parking lot, including the 200 will be on the parking lot. Here's a feature: both the north and north of the two sides will be able to take passengers. Because our passengers on the opposite side of the road to reach the gas station from this side and will be able to reach our passengers. Yol

In the meeting held in Konya Metropolitan Municipality, it was decided to accelerate the works for the completion of the gates as soon as possible by conducting interviews about the subway and overpasses on the Konya-Karaman railroad that will pass through the railway which is within the boundaries of Meram Municipality.

Be the first to comment

Leave a response

Your email address will not be published.


*