Transportation to Boztepe

Transportation to Boztepe will be relieved: Ordu Metropolitan Municipality has started work to facilitate access to Boztepe, one of the most important tourism centers of the city. President Enver Yilmaz, Boztepe, the road to the standards of the road to increase the height of the bus 15 meters and 3 lane can easily use, he said.

ROAD EXPANSION STUDIES STARTED

The works have been started to increase the standard of the road that passes through Nizamettin Quarter of Altinordu district and provides access to Boztepe and to increase its width to 15 m. The land surveys based on the expropriation and zoning plan of the 5,6 km section from Boztepe Cable Car Station to Nizamettin Cemetery were completed. The expropriation map of the parcels on the route was determined and the expropriation map was prepared. Approximately 50 thousand m² of land for the process of expropriation of land owners in negotiations with the ongoing, the land of the immovable property located in the downstream of Boztepe Teleferik Station 1,5 km in the road construction work was started.

PRESIDENT YILMAZ, “WE ARE BUILDING A HIGHWAY OF STANDARDS BAŞ

Mayor Yilmaz, emphasizing that Boztepe is one of the most important tourism centers of the city, yaparak We will increase the attraction of this place with the landscaping work we will do in Boztepe which is an important tourism center of our city. Especially in the summer months, thousands of people go to Boztepe every day with cable cars and private cars or tour buses. In order to ease the intense vehicle traffic in highway transportation and to facilitate the arrival and departure of the tour buses, we have started to work to expand the standard and to extend the road to Boztepe from the Altınordu district center.

15 METER WIDTH AND 3 WILL BE STRIPED

President Enver Yılmaz stated that the existing road will be expanded and the number of lanes will be increased to three, and he said erg At the end of the work we started on the current route of 8 km, we will make a 15 m wide and 3 lane road. 12 m is hot asphalt, 1,5 m is pavement and 1,5 m will be v channel. When the works are completed, we will offer to our citizens as a very comfortable way with its hot asphalt, pavement, v channel, walls, barriers and lighting Çalış.