3rd Bridge - 3rd Airport Railway Project Begins

corona virus obstacle to billion dollar elf in yss bridge
corona virus obstacle to billion dollar elf in yss bridge

The 3rd Bridge - 3rd Airport railway project is starting: The railway project that will pass through Sarıyer, Eyüp, Arnavutköy, Başakşehir and Küçükçekme districts is starting.

Sarıyer, Eyüp, Arnavutköy, Başakşehir and Küçükçekme districts of Istanbul, Uskumru Neighborhood and Halkalı 3 which will pass through the neighborhood. Bridge-3. Airport-Halkalı arı Environmental Impact Assessment is Not Necessary arı was decided in the railway project.

The project, which is planned to be carried out by the General Directorate of State Railways, will be implemented with the project cost of 4 billion 421 million 275 thousand pounds.

3rd Bridge - 3rd Airport - Halkalı The project, which will connect the Railway, Sarıyer, Eyüp, Arnavutköy, Başakşehir and Küçükçekmece districts, will consist of 2 lines, one for arrival and departure. On the railway line, the distance between the lines was planned as 4,5 meters and the platform width as 14,5 meters.

The length of the 19 units of the Railway Line is 34, while the length of the 16 units is 7 and the total length of the project will be 62,5 kilometers. The project is planned to be completed in 200 months.

Be the first to comment

Leave a response

Your email address will not be published.


*