Tram in Izmir does not end the Trouble

The Pain of the Tram in Izmir Does Not End: The 13-kilometer tram line works to be built by the Izmir Metropolitan Municipality between Üçkuyular and Halkapınar has increased the traffic ordeal. The tram station works carried out on Halkapınar Şehitler Street harassed the citizens. The street, which had two departures and two arrivals before, fell into only one lane due to tram works. While the drivers who wanted to reach Alsancak from Mersinli and Çamdibi were traveling as a convoy in a single lane via Şehitler Street, it was observed that the traffic was especially concentrated in the morning and evening. Drivers who want to come from the Konak direction and go to Çamdibi direction can reach Fatih Street from the side streets from the 1st Industrial Site junction. Stating that the tramway works are progressing slowly, the citizens said, “The activity in the construction area, which is being built as the last stop of the rail system at the Gate of Atatürk Stadium of the First Industrial Site, is not progressing. Traffic in industry was turned upside down. We want this ordeal to end as soon as possible, ”he said.

Source : www.yeniasir.com.t is

Armin

sohbet

    Be the first to comment

    Comments