Gaziosmanpasa is the center of transportation

Gaziosmanpaşa is becoming the center of transportation: Gaziosmanpaşa continues to evolve with giant projects in transportation. With the integration of the 4 rail system line and the 2 ropeway that will pass through Gaziosmanpaşa, the district becomes the center of transportation.

Gaziosmanpaşa increases its central role in the region with its new metro lines. Gaziosmanpaşa Mayor Hasan Tahsin The rail system lines shaped by the meetings he gave with the Metropolitan Municipality with the importance he gave to the transportation issue will add great value to the district. The 4 rail system line and the 2 ropeway line, which will pass through the Gaziosmanpaşa district, have an important role in transportation, and it is stated that these works will contribute to the socio-economic and cultural development of the district.

Speaking on the subject, President Usta thanked the Mayor of Istanbul Metropolitan Municipality Kadir Topbaş who gave a great support to Gaziosmanpaşa's transportation system with its rail system and cable car lines and said, a Our district is geographically located in a central location of Istanbul. 3. Airport and Canal Istanbul is located right next to the area of ​​the project. As a result of the interviews we made with IMM in our district, we are introducing the new railway line 2 and 2 new ropeway line as well as existing and ongoing rail system lines. With these projects, the ongoing Urban Transformation projects will be completed and Gaziosmanpaşa will become one of Istanbul's first preferred 10 districts. Gaziosmanpaşa will be the 'brand city' with projects that will ease transportation and facilitate the lives of our people and add comfort. Ulaşım

KABATAŞ-MECİDİYEKÖY-GAZİOSMANPAŞA-MAHMUTBEY METRO IS OPENING IN 2018
Currently, the Hapnler-Edirnekapı-Topkapı rail system line of 15,3 km passes through Gaziosmanpaşa. 2018, which will be commissioned in the 24,5 km long Kabatas-Mecidiyekoy-Mahmutbey metro line project will be the second rail system line will pass through Gaziosmanpasa. Kabatas- Mecidiyeköy- Gaziosmanpaşa - Mahmutbey metro line has an 4 station in Gaziosmanpaşa. The stations in Gaziosmanpaşa will be Akşemsettin, Kazım Karabekir, Yeni Mahalle and Karadeniz Neighborhood. The 19 station, which connects the 8 station, is planned to be completed in the last quarter of 2018. The cost will be 3 million passengers per day in the metro line, which will be 700 billion 1 million, and this line of Bagcilar 24 kilometers will carry 1 million passengers per day. Together with this line, the trip between Bagcilar and Kabatas will be reduced to 75 minutes. There will be 31,5 wagons on this subway line and these subways will be smart vehicles. These metros will move without the driver and will stop at the stop and pick up the passenger. All kinds of comfort of passengers are also considered, passengers will use the internet inside, will be able to charge their phones.

VEZNECILER-GAZIOSMANPASA-SULTANGAZI METRO WILL BRING GREAT COMFORT IN TRANSPORTATION
With the investments to be made after 2019, two new metro lines will pass through Gaziosmanpaşa. The 18,1-long Vezneciler-Gaziosmanpaşa-Sultangazi metro line and the 40,3 km-long Kazlıçeşme-Gaziosmanpaşa-Kağıthane-4. Levent-Kadıköy metro line projects will be realized with the investments to be made after 2019. Among these projects, the Vezneciler-Gaziosmanpaşa-Sultangazi metro line, which has an 4 stop in the district, is expected to bring great relief in the transportation of the district.

The process for the Vezneciler-Gaziosmanpaşa-Sultangazi Rail System Line project, which will serve between the Fatih, Eyüp, Gaziosmanpaşa and Sultangazi districts of Istanbul, has started. The project cost of Vezneciler- Gaziosmanpaşa-Sultangazi metro line was calculated as 2 billion 200 million TL. The route of this rail system line will be connected to the four important regions of Istanbul: Fatih, Eyüp, Gaziosmanpaşa and Sultangazi. The route starts from Vezneciler district in Fatih district and passes through Edirnekapı to Eyüp and Rami to reach Gaziosmanpaşa Meydan. This line then ends in the Masjid al-Salam area through Küçükköy and Yeni Mahalle stops. The project will be carried out by twin tunnel method, which reduces the distance between Vezneciler and Sultangazi to 25,5 minutes and there is a storage area with total 15 station. Gaziosmanpaşa passes the line of this line Gaziosmanpaşa, Küçükköy 1, Küçükköy 2 and Yenimahalle will be.

The project also connects to the Şişhane - Yenikapı metro line at the Vezneciler station, thus ensuring integration with Marmaray. The project will also be integrated in the Yenimahalle subway line of the Beşiktaş-Mecidiyeköy - Mahmutbey metro line to Yenimahalle station, and will be integrated into the planned Zeytinburnu –Kadiköy metro line at the Gaziosmanpaşa station and again to the planned İncirli - Söğütlüçeşme metro line at the Ayvansaray station. Vezneciler bütünGaziosmanpaşa-Sultangazi metro line in this way will have a very important place in the whole of the rail network.

ISTANBUL'S SECOND MARMARAY'S GAZIOSMANPASA'AN
The Zeytinburnu-Kadıköy subway line starts at Kazlıçeşme and ends at Söğütlüçeşme. The line, which will be the second marmara of Istanbul, will pass through Zeytinburnu, Bayrampaşa, Gaziosmanpaşa, Eyüp, Kağıthane, Beşiktaş, Sarıyer, Beykoz, Üsküdar, Ümraniye, Ataşehir and Kadıköy. Tender The project which was started in October in 2016 will start from Kazlıçeşme and follow the Kağıthane-Levent line by passing through Gaziosmanpaşa and connect to the Observatory by the tube passage from Rumeli Hisarı and from there to Söğütlüçeşme. The project is described as Istanbul's ring road subway. The project will be connected to Marmaray from Kazlıçeşme, from Silahtarhane station to Kabataş-Mahmutbey subway, from Ümraniye Çarşı station to Üsküdar-Ümraniye subway and from Söğütlüçeşme to metrobus. The 22 station is planned to be completed by 2023.

TWO TELEFERIC LINE COMES TO GAZİOSMANPAŞA
Due to the topographic structure of Gaziosmanpaşa, the cable car which is prominent as a convenient means of transportation will be added to the district in the next period with the 2 project. The first one will be the Miniatürk-Alibeyköy-Vialand project. Miniatürk -Kinbeyköy cable car line will pass through Gaziosmanpaşa. The second cableway line planned to pass through the district will be the Akşemsettin-Gaziosmanpaşa-Rami cable car line of 2,9 kilometers. When these lines are completed, a pleasant journey will be made with a panoramic view of Istanbul from Gaziosmanpaşa and travel time will be reduced by saving time.

Current Railway Tender Calendar

Salt 19
Tsar 20

Tender Notice: Irmak Zonguldak Line Open Channel and Belt Drainage

November 20 @ 10: 30 - 11:30
Organizer: TCDD
444 8 233
For 21

Tender Announcement: Car Rental Service

November 21 @ 14: 00 - 15:00
Organizer: TCDD
444 8 233

Railway Tender News Search

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments