Turkey's Izmir Opera House Will Be Pupil (Photo Gallery)

Will Turkey's Izmir Opera House Pupil: Izmir Metropolitan Municipality, the history of the Republic "opera" first art turns out to tender on 15 December for the building construction. The construction of the new art temple of İzmir, which will be started in the first months of 2017, will be among the few examples in Europe with its architecture and technical equipment.

The construction tender for the Izmir Metropolitan Municipality Opera House, the project of which was determined by the National Architectural Competition in 2010, will be held on 15 December. The opera house, which will be built in the area owned by the Metropolitan Municipality, will be the first “special for opera art” in the history of the Republic. Following the completion of the tender process, the first digging in the construction works will be hit in the first months of 2017. İzmir will have one of the most important art buildings in Europe after Ahmed Adnan Saygun Art Center.

Will bite finger with architecture

The Izmir Opera House will be at the forefront with its architectural features and technical equipment. The main hall and scenes with 1435 user capacity in this magnificent structure, small hall and stage with 437 audience capacity, rehearsal halls, opera section, ballet section, courtyard-open performance area with 350 audience capacity, workshops and warehouses, main service units, administration department, general facilities , technical center and 525 vehicle capacity will be located in the car park. The plant will have a construction area of ​​approximately 73 thousand 800 m².

Views of the Gulf

The front foyer of the building is designed as a social space that is kept open all day with its bookstore, opera shop, bistro and ticket office. On the road passing in front of the foyer parking lot, public transport stop, car and taxi pockets will be held. There will be two separate entrances from the street facing the sea and the street. After the ticket check, the cloakroom, lifts and the large staircase leading to the main foyer will be reached. The main foyer was planned as the place where the plane from the sea rose and entered the building. This section will be opened to the gulf view due to the visual closure of the distance between the sea and the sea.

Behind the stage, the flat foot will be a structured production area to the extent that the depth of the land allows. The offices, workshops, work and rehearsal rooms here will gather around a courtyard. In this section, which is fed by different inputs, inner atrium will be formed and socialization opportunities will be created for the employees.

Be the first to comment

Leave a response

Your email address will not be published.


*