Current Situation in Eurasia Tunnel Project

Eurasian Tunel
Eurasian Tunel

The latest situation in the Eurasia Tunnel Project: Prime Minister Binali Yildirim's 20 announced that the service will be launched in December under the sea to connect two sides of the Eurasian Tunnel Project was viewed from the air.
The months before the completion of the Eurasia Tunnel Project, which will connect the Anatolian and European sides with the road traffic under the sea, the works were visualized by drone. The works in the project, which Prime Minister Binali Yıldırım announced that it will be put into service on December 20, continue at full speed. Within the scope of the project, it was clearly seen through the aerial images that the roads that will connect Kazlıçeşme to the Eurasia Tunnel were largely completed.

While the works were going on at full speed, signs indicating the direction of the tunnel were placed on the connection roads between Sarayburnu-Kazlıçeşme and Harem-Göztepe. It has been observed that the connection roads that will connect the Eurasia Tunnel along the coast have been expanded, and efforts to create crossroads, vehicle underpasses and pedestrian overpasses are continuing.
The Eurasia Tunnel Project, which will connect the Kazlıçeşme-Göztepe line, will significantly reduce the journey time in the city where heavy traffic is effective. The transportation time between Asian and European sides will reach 100 minutes by car, up to 15 minutes. With the completion of the Eurasia Tunnel Project, citizens will be able to travel quickly by their vehicles.

Be the first to comment

Leave a response

Your email address will not be published.


*