Giant projects waiting for Istanbul

Giant projects waiting for Istanbul: There are many projects waiting for Istanbul after the Yavuz Sultan Selim Bridge becomes operational. Here are giant projects ...
EURASIA TUNNEL
The Eurasia Tunnel Project, realized on the Kazlıçeşme-Göztepe line, will be operational on December 20.
The project that will ensure the passage of the road tube covers the 14,6 kilometer. The 5,4 kilometer of the project is under the sea floor.

  1. AIRPORT
  2. The airport will cover the giant construction area of ​​76 million 500 thousand square meters and will be the biggest in the world with the annual 200 million passenger capacity when completed.
    The first phase of the airport is planned to be put into service in the first quarter of 2018.
  3. FAST TRAIN TO AIRPORT
  4. A high-speed train will pass through Yavuz Sultan Selim Bridge to reach the airport.

    LARGE ISTANBUL TUNNEL WITH 3 FLOOR
    One pillar of the project is the high-capacity and fast metro system starting from Incirli on the E-5 axis on the European Side and extending through the Bosphorus to Söğütlüçeşme on the Anatolian side, and the second leg is the Hasdal Junction on the TEM Highway axis on the European side. It will consist of a high-capacity and fast metro system starting from the Bosphorus and extending to Söğütlüçeşme on the Anatolian Side and a 2 × 2 lane road system connecting to Çamlık Junction.

    It will take approximately 14 minutes by road from Hasdal Junction on the European Side to Çamlık Junction on the Anatolian Side. 6,5 million passengers are expected to benefit from the line daily.

    In the project, tender, project and engineering services tender was held. The process continues.

    KANAL ISTANBUL
    The project is still underway.

    METRO TO SABİHA GÖKÇEN
    Kadıköy - It will be connected to the Kartal subway by rail system. The project is expected to be completed in the first quarter of 2018.

Be the first to comment

Leave a response

Your email address will not be published.


*