Izmir Alaybey Tramway Works Started (Photo Gallery)

Izmir Alaybey Tram Works Started: İzmir Metropolitan Municipality completed the construction works at a rate of 80 Karşıyaka started construction of the Alaybey line in the tram project. Karşıyaka The 1 km section from Pier to Alaybey was planned as a “single line” and included in the project in order to preserve the existing tree texture.
Izmir Metropolitan Municipality, which will ease the urban traffic, suburban and suburban Karşıyaka The construction of trams continues rapidly.
In the planning of lines and routes, in addition to scientific determinations, the Metropolitan Municipality which takes into consideration the demands from the public within the framework of participatory understanding, Karşıyaka It extended the tram line, which is planned to come to the front of the pier, 1 km more to Alaybey upon high demand. 80 percent of the line manufacturing has been completed Karşıyaka The first digging for the Alaybey division in the line was shot. Karşıyaka The project designed as a hat single line için in order to ensure the safe passage of the citizens to the pier after the pier will be made as a cross section of the grass along the Muammer Aksoy Park.
Proprietary trees to be protected
Izmir Metropolitan Municipality, who carried out a comprehensive tree detection study on the route in Muammer Aksoy Park, announced that the registered trees will be meticulously protected. In the current texture, 2 pieces of jacquard, 1 pieces of ligustrum, 1 pieces of ornamental diamonds, 3 pieces of black pepper, 1 pieces of palm and 1 pieces of wild palm type trees and 50 pieces of bush group bushes outside the route are suitable in the same area. be moved to an area or to the nurseries of the Municipality.

Be the first to comment

Leave a response

Your email address will not be published.


*