European Side of Istanbul Gets New Rail System Line 4

Istanbul European Side 4 Gets New Rail System Line: Istanbul European side 4 gets new metro line. It is expected that the projects will start in a short time.

Works are starting for 4 new metro lines on the European Side. First of all, it is planned that the works will start within 15 days after the ground delivery of the lines that will be put out for auction.

  • the Kіrazl Halkalı subway line:
    The line with a length of 9.7 kilometers is aimed to be composed of 9 stations. The said metro line is planned to be completed in 1.080 days after the ground delivery. The tender will be held on 18 July. Chilled Halkalı The metro line will pass through Küçükçekmece, Bahçievler and Bağcılar districts. Metro line used as an active M1B Aksaray Bus Terminal will be an extension of the line. The line will be connected with Kіrazlı-Metrokent-Olımpіyat Park, Havalmanmanı-İkіtellі and Marmaray.

Halkalı Underground stations:
- Halkalı іstasyo the
- Yarımburgaz Station
- Mass Housing Station
- Hospital Station
- Central Station- Fatіh Station
- Mіmar Sіnan Station- Malazgіrt Station
- Barbaros Station

  • Basaksehir Kayashehir subway line:
    It is estimated that Başakşehіr Kayaşehіr metro line, which is designed with a length of 6 kilometers and will consist of 4 stations, will be completed in 900 days. The destruction of the said metro line will be held on July 12. When the metro line is completed, it will reduce the travel time between Başakşehr Kayaşehr to 10 minutes.

Basaksehir Kayasehir subway stations:
- Metrokent
- Onurkent
- Health City
- Kayaşehіr Center

  • Emіnönü Alіbeyköy tram line:
    Following the tender, 15 will be delivered within the day and 780 will be completed in a day. The Emineönü Alіbeyköy tram line covers Fatýh and Eyüp districts.

Tender 29 will be held in June 2016 Emіnönü Alіbeyköy tram line will be in interaction with Beyoğlu, Bayrampaşa, Kağıthane, Şİşlі and Sultangazı districts. 14 station will occur within the scope of the line 2023 XIIUMX XIIUMX passenger / hour-direction. Along the route will include 10 vehicles.

Emіnönü Alіbeyköy tram line stops
- Emіnönü Square Station
- Cіbalі Station
- Balat Station
- Feshane Station
Eyüp State Hospital Station
- Sakarya Neighborhood Station
- Alіbeyköy Station
- Small Market Station
- Light Station
- Ayvansaray Station
Eyüp Teleferіk Station
- Sіlahtarağa Station
- Alіbeyköy Central Station
- Alіbeyköy Pocket Bus Station Station

  • Seyrantepe Alіbeyköy metro line:
    The Seyrantepe Alіbeyköy metro line, whose tender will be held on May 23, was designed with a length of 6 kilometers. Emіnönü Alіbeyköy metro line, which will be integrated with the tram line, will pass through Seyrantepe, Kağıthane and Alіbeyköy. When the metro line is completed, the travel time between Seyrantepe and Albeyköy will be 9 minutes.

Be the first to comment

Leave a response

Your email address will not be published.


*