Izmit Bay Crossing Suspension Bridge Aerial View (Video)

Izmit Bay Crossing Suspension Bridge Aerial View: Izmit Bay Crossing Suspension Bridge, which is the fourth biggest suspension bridge in the world, is still under construction.

Kocaeli Metropolitan Municipality teams, Izmit Gulf Crossing Suspension Bridge "drone" images taken with the press shared with members.

The towers reaching 6 meters in the bridge that will reduce the Gulf transit time to 252 minutes, won a new silhouette to Izmit Bay.

It was seen that the bridge between Istanbul and Izmir was the biggest leg of the Gebze-Orhangazi-İzmir Motorway Project, which will reduce the transportation time from 9 to 3,5 hours.

650 million-year savings are envisaged

The construction period of the Gebze-Orhangazi-İzmir Motorway Build-Operate-Transfer project was determined as 7 year. Izmit Bay Crossing Suspension Bridge, this year is expected to open to traffic.

The advantages that the whole highway will shorten the distance to the 95 mileage according to the current state route are calculated in the feasibility studies, resulting in the 8-10 hour of 3-3,5 hours to be reduced to 650-XNUMX hours and in return XNUMX million dollars will be saved.

Similar Railway News

Similar High Speed ​​Train News

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.