Between Arifiye and Pamukova 2. The deadline for bidding of the Line Railway Project was postponed

TCDD Between Arifiye - Pamukova 2. The deadline for bidding of the Line Railway Project was postponed
TCE. The General Directorate of the State Railways Directorate has been awarded the II. 2014 / 56255 KIK numbered Arifiye (131 + 900) - Pamukova (Km: 167 + 500) II. The tender for line railway supply construction was postponed to the 04 April 2016 day, which was postponed to the 10 2016 13 2016 day. As it is known, Unitek, which applied to the Court on the decision made by the GCC recently, won the joint venture and the court decided to cancel the decision of the GCC, which is related to the removal of Unitek construction - tour construction joint venture from the prequalification list.
As a result, Unitek Construction - Tour Construction Joint Venture was shortlisted again and Dido-Ray Construction Company was removed from the list.

Current Railway Tender Calendar

For 21

Tender Announcement: Car Rental Service

November 21 @ 14: 00 - 15:00
Organizer: TCDD
444 8 233
For 21

Procurement Notice: Procurement of Railway Electrification Spare Parts

November 21 @ 14: 30 - 15:30
Organizer: TCDD
444 8 233
For 21

Railway Tender News Search

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments