3. Bridge to make a minimum of 1.1 Million in revenue per day

  1. The Bridge will make a minimum turnover of 1.1 Million in a day: IC İçtaş Az 3 which is part of the Northern Marmara Motorway Project to be built by Astaldi JV. after the construction of the bridge will print almost money.
    After the Bosphorus Bridge, which became operational in 1973 and the Fatih Sultan Mehmet Bridge, which was completed in 1988, the third bridge built on the Bosphorus is approaching the end.
    3 will cost $ 1 billion in the project, which will be commissioned in August. 3. The construction of the bridge and highway is the Treasury guarantee for the 3 bin car pass every day, including the 135 dollars per vehicle when the construction is complete.
    Thus, the daily income of the bridge will be at least 405 thousand dollars (1.1 million TL). This figure will find 15 dollars in heavy vehicles.

    THIRD BRIDGES WITH FIGURES
    10 lanes - The bridge has 4 departures, 4 arrivals and 2 railway lanes.
    59 meters - The total width of the bridge
    1408 meters - The length of the bridge over the sea
    6.500 - Number of workers working on the bridge project
    29.05.2013 - The date when the construction of the bridge started
    3 billion dollars - The total cost of the bridge project
    2 towers - The length of the towers is 322 meters on the European side and 318 meters in Asia.
    116 km - The length of the road built in the 3rd Bosphorus Bridge and Northern Marmara Motorway Project

Be the first to comment

Leave a response

Your email address will not be published.


*