35 Izmir

Door failure in İZBAN

Door failure in IZBAN has been ruled out: Door failure in IZBAN has been ruled out. As a result of the breakdown at the door of the train, the flights were delayed for 30 minutes, while the stations were busy. [more…]

35 Izmir

İZBAN follow-up from Sertel

Following İZBAN from Sertel: CHP Izmir Deputy Atila Sertel said that they expect the suburban train running between Aliaga and Torbali as CHP Izmir Deputies to Bergama. CHP İzmir Deputy Atila [more…]

RAILWAYS

YHT stop to Osmangazi

YHT stop to Osmangazi: Upon completion, High Speed ​​Train studies, which will make a great contribution to the transportation sector, continue. Will connect the Central Anatolia Region with the provinces of the region [more…]

18 Cankiri

Ilgaz Mountain Winter Climbing

Ilgaz Mountain Winter Climbing was held: Ilgaz Mountain Winter Climbing was held in Çankırı with the participation of 19 athletes. Nuri Erkenci, Head of Çankırı Mountaineering and Search and Rescue Sports Club, AA [more…]

25 Erzurum

Palandökende full of hotels

Palandöken hotels full draws: Turkey's air crisis has had with Russia, followed by tensions in the Middle East and detonated a bomb in Ankara, the Turkish tourism was affected negatively. Turkey, Russia [more…]

29 Gumushane

KYK students stressed Zigana stress

KYK students relieved stress in Zigana: Zigana Silver skiing by the Credit and Hostels Institution (KYK) Gümüşhane Provincial Directorate, within the scope of social activities for students living in dormitories [more…]

TENDER BULLETIN

RayHaber 01.03.2016 Tender Bulletin

Establishing Level Crossing with Automatic Barrier with E Signal System (Goncalı-Denizli Line KM 258 + 145) Mold Separator Chemical Material Will Be Purchased Loading and Lowering of Concrete Sleepers to Wagons [more…]