İZBAN is in Torbalı on Saturday, February 6

İZBAN on Saturday, February 6 in Torbalı: AK Party İzmir Deputy Mahmut Atilla Kaya announced that the first time will be held on Saturday, February 6th in the project, which was built within the scope of İzmir Suburban System and that the existing Aliağa-Cumaovası line was extended to Torbalı.
Giving the good news that the flights will start with the instructions of the Minister of Transport, Maritime Affairs and Communications, Binali Yıldırım, “The first flights on the İZBAN Torbalı line start on Saturday, February 6, as planned previously. Our Minister, Binali Yıldırım, gave an order, and agreed with İzmir Metropolitan Municipality Mayor Aziz Kocaoğlu, our citizens will be able to travel from Izmir to Torbalı and Izmir to Torbalı on Saturday, February 6.
The official opening ceremony, which has been postponed, will be held on another date, since our Minister Binali Yıldırım will accompany the Prime Minister of Kazakhstan program.
Our Minister stated that the delaying of the opening ceremony will not prevent the service, therefore, the line should be put into service as soon as possible, and ordered to start the expeditions. We thank him very much. ”
Central government and local government cooperation
After the expedition to Turkey's Marmaray project, the largest urban commuter system, which bagged the line izban Transportation, Maritime Affairs and Communications Minister Binali Yildirim gave instruction begins.
In order to produce a permanent solution to the urban transportation problem of İzmir, when the Torbalı line is put into operation in the rail system, which will cooperate with the central government and local administration, and will serve in the metro standard, the existing 80 km suburban line will increase to 110 kilometers.
As it is known, on March 14, 2011, a protocol was signed between TCDD and İzmir Metropolitan Municipality in order to extend the existing system to the south of Cumaovasi-Tepeköy. Within the scope of the protocol, TCDD has added a new 2nd line to the existing railway line between Cumaovası-Tepeköy stations, constructed the under-superstructure of the line, built the walls for the tender to ensure uninterrupted operation of the line, and built the signal-electrification and telecommunication facilities. In accordance with the protocol, İzmir Metropolitan Municipality completed the construction of 6 stations, 7 underpasses and 2 overpasses within this period.
Reminding that there will be a serious relief in the city traffic with the opening of the line, which has successfully completed trial runs, AK Party Izmir MP Mahmut Atilla Kaya said, “With the opening of the İZBAN Torbali line, our citizens will have a comfortable transportation opportunity. A serious relief will be provided in urban traffic. Our Minister Binali Yıldırım added another one to the works he brought to İzmir. At this point, we are grateful to him. İZBAN Torbalı line should be auspicious to our city. ”

Be the first to comment

Leave a response

Your email address will not be published.


*