Akçaray will carry passengers at 2017

Akçaray will carry passengers at 2017: The tramway project, which is the first of the Kocaeli Metropolitan Municipality's light rail system projects, continues uninterruptedly. While the rails to be used on the route are being manufactured, Akçaray's vehicle production process continues. Head of Transportation Department Mustafa Altay and the delegation accompanying him conducted a study at Durmazlar's factory in Bursa.

OCTOBER WILL BE DELIVERED IN 2016

The head of the department Altay and the technical team will produce the vehicles of Akçaray, Durmazlar Makine Sanayi ve Tic. A.Ş. visited its factory in Bursa. The Metropolitan delegation examined the Bursa LRV vehicles in the factory and Bursa tram cars. As regards the Akçaray vehicles, views on industrial design were exchanged and the concept was reached. After the final analysis and design approval, the production of the first vehicle will be started and will be delivered in October of 2016.

12 CAR VEHICLE WILL BE PRODUCED

The tender for the production of 12 units of Akçaray will be the starting point of the rail system period in Kocaeli. 19 million 740 is a domestic company with% 100 and Bursalı Durmazlar Makine Sanayi ve Tic. Inc. He had won. Recently, the Mayor of Kocaeli Metropolitan Municipality İbrahim Karaosmanoğlu and Durmazlar Makine Sanayi ve Tic. Inc. Deputy Chairman Fatma Durmaz Yılbirlik signed a contract.

Between GAR and SEKAPARK

For the tram project financed by Kocaeli Metropolitan Municipality with its own resources, the bus terminal between the bus station and Sekapark-Yahya Kaptan, District Governor-N. Kemal Lisesi-East Barracks, Governorate, Fair, Yeni Cuma-Fevziye Mosque-Gar-Sekapark route was determined.

AKÇARAY WILL PROVIDE PASSENGER IN 2017

Akçaray will start passenger transportation in 2017 after the works. There will be a two-way, 7,2-kilometer, 11 station on the tramway between Sekapark-Otogar; The people of Kocaeli were given the name Akçaray by the votes they gave over the internet and the color of the people was determined as turquoise.

16 THOUSAND PASSENGER IN DAY

The length of the vehicles to be produced was designed as 32 m, width 2,65 m and height 3,30 m. The maximum speed of vehicles to be produced in two-way and 100 with low base will be 70 km per hour and average operating speed will be 20 km per hour. Sekapark ayı Between the bus station and the 6 minute voyage in the opening year, the Metropolitan Municipality aims to carry a thousand people a day and plans to increase this number every year with additional investments in the rail system area.

300 PASSENGER CAPACITY VEHICLES

For maximum mobility in the city, 5 passenger trolleys with 300 modules will be equipped with 4 double and 2 single doors. Akçaray; comfort, aesthetics and environmental sensitivity to serve the people of Kocaeli.

17 VEHICLES WILL BE COMPLETED

The contractor is requested to deliver 12 vehicle after 1 month, 14 vehicle after 2 month, 15 vehicle after 3 month, 16 vehicle after 3 month and 17 vehicle after 3 month and 12 vehicle after XNUMX month.

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.