Level Crossing Alert for Drivers on Samsun-Sivas Train

Level Warning for Drivers on the Samsun-Sivas Train Road: General Directorate of State Railways, Samsun-Sivas (Kalın) Railway Line to warn the drivers passing by, the drivers were asked to pay attention to the work machines at the level crossings.

In the written statement made by the General Directorate of State Railways, railroading of the N Samsun-Kalın (Sivas) Railway Line Modernization Project was started on 29 on September 2015 and the railway line was closed to train operation for 2 (two) years. However; As Samsun-Kalın (Sivas) railway line will operate on road construction machines, it is important for the drivers who will use level crossings to comply with the level crossing rules in terms of safety of life and property.

T 9.5 BETWEEN SAMSUN-SIVAS WILL FALL 5 CLOCK X

The statement also includes the following information: N With the project planned to be completed at the end of 2017; The travel time between Samsun and Sivas will be reduced from 9.5 to 5 hours. In addition to passenger transportation, the daily capacity of the line, which is an important axis for freight transportation, will be carried out from the 21 train to the 54 train, while the level crossings will be made automatic barrier, while the platforms at the stations and stops will be improved in accordance with the disabled access to EU standards. With the project, which will cost 258.8 million euros, the railway will be advantageous in freight and passenger transportation. X

Be the first to comment

Leave a response

Your email address will not be published.


*