High Speed ​​Train at 2019 Çerkezköy'also

Halkalı Edirne High Speed ​​Line Route
Halkalı Edirne High Speed ​​Line Route

High Speed ​​Train at 2019 Çerkezköyof Tekirdağ Çerkezköy in the district Halkalı-Information meeting was held in the Hall of Public Education Center about Kapıkule Railway Project. Cenk Peker, one of the authorities of the undertaking of the project, Halkalı-Kapıkule said they were planning to operate high-speed trains until 2019.

Tekirdağ Provincial Directorate of Environment and Urbanization Grontim Engineering Cenk Peker, Bülent Kadıoğlu, from the officials of the meeting, where Tuna Özel spoke Çerkezköy Kaymakamı Metin Kubilay, District National Education Director Huseyin Erdogan, Branch Director Irfan Danismaz, District Public Education Center Director Necmi Akman and 15 people attended.

“I BELIEVE THAT THE HIGH SPEED TRAIN WILL INCREASE OUR REGION”

Speaking at the meeting Çerkezköy District Governor Metin Kubilay said that he believes that the high-speed train will add surplus to the region, “I had a series of interviews with the authorities about the start of the train services, which have been suspended for a while in our district, and as a positive development, at least the old train services will start in a month. I see. For this reason, I wish you success in your works and I hope that the works will be completed in a short time. ”

“IT IS MADE IN EUROPEAN STANDARDS”

Stating that the information meeting was organized under the coordination of the Ministry of Transport, Maritime Affairs and Communications, the European Union Investment Department and the TCDD General Directorate, Tekirdağ Provincial Directorate of Environment and Urbanization Branch Manager Yalçın Karaca said, “Istanbul Halkalı An electric and double track railway line, starting from the Station and ending at Edirne Kapıkule Station, is about 229 kilometers. Necessary improvement works on the railway line route that passes through the borders of our city will be made at European standards.

We have presented to them a report on what kind of work the company carrying out these studies should do in our region ”. Halkalı A high-speed train line between Kapıkule and Istanbul Cenk Pekersaid the high-speed train 3-4 will be operational during the year. Peker, with the studies Halkalı The 229 kilometer railway between Kapıkule has been reduced to 200 kilometer and transportation time will be shortened and the route is located between the 73 kilometer and 113 kilometers in the province of Tekirdağ.

Çerkezköy Expressing that the railway route has been carried out to indicate the current environmental characteristics, Peker said, “In this route, surface water quality determination, air quality determination studies, background noise measurements in the nearby settlement and the station site, terrestrial and aquatic flora-fauna studies, soil quality sampling studies. ground survey and mapping studies will also be carried out. The results of these studies will be detailed in the environmental impact assessment report to be prepared. ”

“HALKALI-KAPIKULE FAST TRAIN SERVICES ARE PLANNED TO OPERATE BY 2019”

HalkalıStating that Kapıkule high-speed train plans are planned to be operational by 2019, Peker said, “A total of 50 meters of land along the route to the left and right of the line will be expropriated by TCDD and the land prices will be paid to the owners by TCDD. Also, when the high-speed train line goes into operation ÇerkezköyThere will be a passenger station and a cargo station in. The freight station will be somewhere 6 kilometers from the passenger station. However, a place has not been determined about where the load station will be built, and work is ongoing in this direction. Halkalı- Kapikule high speed train services are planned to be operational by 2019. The works are continuing rapidly and we inform the people of the region in this regard ”.

Halkalı Çerkezköy Fast Train Map

Be the first to comment

Leave a response

Your email address will not be published.


*