GENERAL

Renovation of Train Rails in Van

Van Train Tracks Renovation Work: The Republic of Turkey State Railways (TCDD) 5. Rails and sleepers in the 116 kilometer area between Van Region and Van-Kapikoy were renewed. The Republic of Turkey State Railways (TCDD) 5. Regional Directorate of 116, located between Van and Kapikoy [more…]

34 Istanbul

3.köprü very robust output

3.köprü was very solid: The quality of the materials used in the construction of Yavuz Sultan Selim Bridge, especially concrete, was reported to be well above the standards. The quality and strength of the materials used in connection with Yavuz Sultan Selim Bridge [more…]

07 Antalya

Antalya 2 final stage rail tender is concluded

Antalya 2 stage stage tender has been concluded: The 18 2 stage rail system tender was concluded in ANTALYA. The tender carried out by the Ministry of Transport, Maritime Affairs and Communication was awarded to Makyol Construction with the offer of 259 million 498 thousand pounds. Antalya from the Square [more…]