34 Istanbul

Metrobus road asphalt rant gate

Metrobus road asphalt rant gate: Istanbul's burden of metrobus that has to be renewed every year, brought the allegations. 8 has been looking for other reasons under the absence of the right asphalt. Every year the metrobus carrying the burden of Istanbul [more…]

RAILWAYS

Bay Transition Bridge Illuminated (Video)

The Gulf Transition Bridge was illuminated: The illumination of the cat road, which was completed at the İzmit Bay Bridge, which is the most important transit point of the highway project between Istanbul and Izmir, added a new color to the Gulf. Istanbul-Izmir between the 3.5 hour to download the most important [more…]

GENERAL

Fire panic in wagon factory

Fire panic in the wagon factory: A fire broke out in the yard of the factory where the wagons were manufactured at SIVAS. Fire teams extinguish the factory fire without fear, caused fear. The event took place at 14.30 in the Organized Industrial Zone. Contact Nurettin directly [more…]

34 Istanbul

Commuter line up at 2017

The commuter line is in 2017: Sirkeci-Halkalı and the suburban lines between Söğütlüçeşme and Gebze were closed for Marmaray two years ago. Gebze-Halkalı The integration works aimed at establishing an uninterrupted rail system were planned to be completed in the last months of 2015. So what [more…]

34 Istanbul

The wagons are loaded

Istanbul's burden is full of wagons on the wagons: the suburban lines Marmaray project and fast train integration within the removal of the Anatolian and European lines, almost turned into a train cemetery. Suburban lines of Istanbul, which has taken a huge burden on transportation since its establishment [more…]