First tender for Buca Metro

The first tender for the Buca Metro: a new move for the ”contemporary transportation daha from the Metropolitan

The feasibility, transportation and ground survey tender was held with the application project for the Üçyol-Buca Koop metro line of the 9.5 kilometer. After the approval of the Ministry of the projects, construction tender will be made. The journey time of the planned line will be approximately 20 minutes.

After the Narlıdere Metro, İzmir Metropolitan Municipality made a tender for Buca Metro. Within the scope of the tender, application projects, tender documents, EIA report, transportation study, feasibility report and ground surveys and warehouse area and building preparation consultancy services will be carried out. As soon as the tender, which is currently under review by the commission, will be concluded, the works will be started and all work will be completed in 9.5 months. Following the acquisition of the projects, the tender will be awarded by the Ministry of Transport, Maritime Affairs and Communications, Directorate General of Infrastructure Investments and Ministry of Development.

The total 9.5 kilometer in Buca Metro will follow Halide Edip Adıvar Street from Üçyol. Following the Mehmet Akif Street, Şirinyer Junction, Buca Belediyesi front, Hasanağa Garden as well as Dokuz Eylül University Tınaztepe Campus and the last station will extend to the Buca Koop region. The journey time of the planned line will be approximately 20 minutes.

Ads

Similar railway news

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.