Survey studies for the Hisarüstü- Aşiyan Funicular Line are starting: Istanbul Metropolitan Municipality is starting the study of the Hisarüstü- Aşiyan Funicular. The Aşiyan Funicular, which will enable the Levent-Hisarüstü metro to reach the Bosphorus, which connects Yenikapı and Marmaray, will facilitate access to the center. The length of the Funicular Line between Hisarüstü and Aşiyan Park will be 730 meters, and the height difference between the starting and ending stations will be 104 meters. The beach will be descended from the area where Aşiyan Park belonging to the Metropolitan Municipality is located. The system is aimed to be economically realized and provide the passenger with the opportunity to cruise with a route on the slope (not requiring a drilling tunnel). When the project is implemented, Istanbul residents who take the funicular from the coast will be able to get to Hisarüstü in 3 minutes and reach the integrated "Hisarüstü-Levent Mini Metro" at that point.
Related Articles
Ü Reliability in Public Transport ş Award to Mersin Metropolitan Municipality
Mersin Metropolitan Municipality won the first prize for 'Reliability in Public Transportation' at the 2017 International Istanbul Transportation Congress and Fair, organized by the Union of Municipalities of Turkey and Istanbul Metropolitan Municipality. [more…]
Alstom Turkey with the privatization of TCDD will make the production and export base
It whetted French Alstom's investment appetite for Turkey. Alstom also announced that they would be interested in TCDD if it was privatized. Increasing railway and rail system projects in Turkey in recent years, [more…]
Yenikapı-Sefaköy subway line approval from the ministry
Approval from the ministry for the Yenikapı-Sefaköy metro line: The EIA process started in the Yenikapı-Sefaköy metro line project in the past weeks. Approval was received from the ministry within the scope of the Yenikapı-Sefaköy metro line project. Total 1 [more…]
Be the first to comment