Gebze Kuzey - Gebze Gar - Darica Light Rail Line Project The tender for the preparation of the preliminary feasibility study was awarded by Boğaziçi Project

Kocaeli Metropolitan Municipality Gebze Kuzey - Gebze Gar - Darica Light Rail System Line Project Bosphorus Project won the tender for the preparation of the preliminary feasibility study

The tender of. Preparing the Pre-Feasibility Study for Gebze North - Gebze Gar - Darica Light Rail Line Geb was completed by the Directorate of Transportation Department of Kocaeli Metropolitan Municipality Directorate of Rail Systems on the 02 July 2015 Day.
Investments MagazineAccording to the information; the cost of the project was determined as 347.000 TL.
The contract will be signed with the company after the completion of the legal period. As is known, the other company participating in the tender was Proyapı Engineering.
Reference: Investments 1240 / 06 July 2015

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.