Havaray doping

Havaray doping for Istanbul Transportation: In addition to rail systems, new Havaray lines will be built in order to facilitate public transportation in Istanbul. In Istanbul, where millions of people travel underground, air travel will be possible without getting stuck in traffic. Thanks to the havaray projects that provide fast and comfortable transportation, access to inaccessible areas will be easier. The routes of the Havaray projects to be carried out by the Istanbul Metropolitan Municipality, whose total length is determined as 47.8 kilometers, has already been determined. The municipality allocated 2014 billion lira of its 2019-5 budget for transportation. Havaray projects, which have been on the agenda recently, are among the investments that will relieve the traffic. Previously, Üsküdar-Libadiye Street and Sefaköy-Halkalı-Başakşehir havaray projects had their first tenders. Istanbul Metropolitan Municipality has 8 more Havaray projects, which are still in the study phase. The total length of these projects is 47.8 kilometers.

PROJECTS AND LENGTHS

Beyoğlu-Şişli havaray project: 5.8 kilometer
Zincirlikuyu-Sarıyer havaray project: 4.5 kilometer
4. Levent-Levent project: 5.5kilometre
Ataşehir-Ümraniye Havaray Project: 10.5 kilometer
Sefaköy-Airport Havaray Project: 7.2 Mileage
Maltepe-Başıbüyük havaray project: 3.6 kilometer
Kartal-D100 havaray project: 3 kilometer
Sabiha Gokcen Airport - Formula Havaray Project: 7.7 Mileage

Be the first to comment

Leave a response

Your email address will not be published.


*