Tender Announcement: Wheel set and wheel body will be purchased (TÜDEMSAŞ)

Wheel assembly and wheel casing will be purchased
TURKISH RAILWAY MACHINES INDUSTRY INC (TÜDEMSAŞ)

The purchase of the WHEEL TEAM and WHEEL BODY shall be awarded in accordance with the 4734 of the Public Procurement Law No. 19 with open tender procedure. Detailed Information about the auction can be found down below:
Tender Registration Number: 2015 / 47928
1 of Administration
a) Address: KADI BURHANETTIN MAH. 58059 SIVAS CENTER / SIVAS
b) Telephone and fax number: 3462251818 / 4699-4683 - 3462235051
c) E-mail Address: auction@tudemsas.gov.tr
ç) The internet address of the tender document (if any): https://ekap.kik.gov.tr/EKAP/

2-The subject of the tender
a) Quality, type and quantity:
2 Pencil Wheel Set and Wheel Body according to Technical Specification and Purchase Specification and Drawings
Detailed information can be obtained from the administrative specification contained in the tender document in EKAP.
b) Place of Delivery: TÜDEMSAŞ General Directorate for Local Requestees -SİVAS DDP for Foreign Bidders (Delivered Duty Paid) TÜDEMSAŞ General Directorate -SİVAS
c) Delivery date: After the first party contract, the second party will be delivered as two equal parties within the 80 days after the first batch is delivered.

3- Tender
a) Location: TÜDEMSAŞ General Directorate-SİVAS
b) Date and time: 09.06.2015 - 14: 00

ihale_dokumani_xnumx_xnumx

Tender notices published on our website are for information only and do not replace the original document. The original document is valid for the differences between published documents and original tender documents. Our sources are Official Gazette, Daily Newspapers, Public Institutions and Institutions web pages.

Armin

sohbet

Comment

  1. Wheel tool axle, wheel body is procured by subsidiaries and tcdd every year. Parts of the piece increases both the volume. If the wheel body, bearing, axle, brake material is supplied from a single source, the unit price decreases. And the reception is done. Stolen material is given enough instead of the required amount and the amount is invoiced. The minimum amount of 10 year wheel set can not be made. If the TCDD supplies the common material from a single source, they will get the quality at the same time. according to the terminate is planned.

Comments