Kadir Topbas gave the new metro gospel 4

Kadir Topbaş 4 gave the new metro gospel: Istanbul Metropolitan Municipality Mayor Kadir Topbaş, Dudullu-Bostancı, Levent-Hisarüstü, Ataköy-Basın Ekspres-İkitelli, heralded the commencement of the construction of Bakırköy İDO-Bağcılar Kirazlı metro lines simultaneously.

400 NEW BUS, 10 NEW SHIP
Stating that 10 new ships will be added to the City Lines, Topbaş announced that they have made 4 of these ships ready and that the ships will be put into service in the coming weeks.
Topbas, renewing the IETT fleet, this year in a single pen 400 new buses by purchasing more stressed that they will offer to Istanbul.

ATAKOY-IKITELLI METRO LINE
İkitelli-Ataköy Metro Line; Starting from Ataköy and merging with Marmaray, it will follow a corridor parallel to Basın Ekspres Connection Road. It will reach İkitelli Güney Sanayi Station of Başakşehir-Kirazlı Metro Line in İkitelli.
On the other hand, Aksaray-Airport Light Metro Line, which is still operating in Yenibosna, will be integrated with Metrobus and the planned Yenikapı-Bakırköy-Beylikdüzü Metro. Ataköy-İkiteli Metro will serve both on the route it has passed and Kirazlı-Olimpiyatköy and Kabataş It was planned to carry passengers to Mahmutbey subways.
Station 12
Line length 13 Km.
Passenger capacity 45 thousand hours
Travel time 19,5 minutes
STATIONS Atakoy, (Marmaray) Yenibosna, Cobancesme, Kuyumcukent, East Industry, Mimarsinan, Evren Neighborhood, İkitelli Junction, Mehmet Akif, Bahariye, Masko, İkitelli Industry.

BOSTANCI - DUDULLU METRO LINE
It will start from Bostancı İDO station and reach Dudullu via Kozyatağı, İçerenköy, Türkiş Blocks. The line to be integrated with Marmaray is in Kozyatağı Kadıköy- Eagle Eagle Metro, Kadıköy-Ataşehir-Ümraniye-Sancaktepe-Sultanbeyli Metro will be connected to Üsküdar-Ümraniye-Çekmeköy Metro which is at Dudullu station.
Station 13
Line length 14,27 km
Passenger Capacity 45 thousand hours
Travel Time 22 Minutes
STATIONS Bostancı, Suadiye, Üst Bostancı, Kozyatağı, Küçükbakkalköy, İçerenköy, Kayışdağı, Türkiş Blaklorı, İMES, MODOKO, Dudullu, Yukarı Dudullu, Depo.

KABATAŞ-MECİDİYEKÖY METRO LINE
The construction will be connected to the Mahmutbey- Mecidiyeköy line. Kabataş -Mecidiyeköy subway construction and electromechanical systems tender was made. Construction and electromechanical works will be carried out at the same time in both stages and metro lines will be put into service in a shorter time.
Station 4
Line length 6.5 km
Passenger Capacity 70 thousand hours
Travel Time 10 Minutes
STATIONS Kabataş, Beşiktaş, Mints, Mecidiyeköy

When the line is commissioned, 4 point will be integrated with existing rail systems.
Kabataş-Taksim Funicular line and Eminönü-Kabataş by tram Kabataş'T,
Yenikapı-Hacıosman Metro line in Mecidiyeköy,
Topkapı-Sultançiftliği line in the Black Sea neighborhood (Metris region)
Integration will be achieved in Mahmutbey with the Bus Station-Bağcılar-Başakşehir line.

BAKIRKOY-CHERRY METRO LINE
Kirazlı-Bakırköy İDO metro line is planned as a continuation of Başakşehir-Kirazlı Metro Line. The tender was made. It is stated that construction works will start in a short time. The line, which is integrated into Marmaray in Bakırköy Square, will be connected to Yenikapı-Bus Station-Airport Line in İncirli. The tender works will continue to be integrated in Yenikapı-İncirli-Sefaköy Metro Line in İncirli.
Station 9
Line length 9 km
Passenger Capacity 70 thousand hours
Travel Time 13.5 Minutes
Stations Bakırköy İDO, Freedom Square, Zuhuratbaba, İncirli, Haznedar, İlkyuva, Yıldıztepe, Mollagürani, Kirazlı.

Be the first to comment

Leave a response

Your email address will not be published.


*